A platform for research: civil engineering, architecture and urbanism
Reinforcement cage positioning frame, reinforcement cage positioning jig frame and all-meat secant pile construction method thereof
The invention relates to the field of constructional engineering, and particularly discloses a reinforcement cage positioning frame, a reinforcement cage positioning jig frame and a full-meat secant pile construction method.The reinforcement cage positioning frame comprises a supporting unit for B pile construction, the supporting unit comprises two positioning check blocks, and the positioning check blocks are provided with positioning pieces detachably connected with a guide wall; one side of the positioning stop block is an arc-shaped surface for limiting the arc-shaped outer wall of the reinforcement cage; the cross beam is horizontally arranged on the reinforcement cage, and the cross beam is located between the two positioning check blocks and abuts against the guide wall; one end of the lifting hook is connected with the cross beam hanging buckle, and the other end of the lifting hook is connected with the reinforcement cage hanging buckle. According to the scheme, when the reinforcement cage of the B pile is lowered, the arc-shaped faces of the positioning stop blocks limit main reinforcements of the reinforcement cage, and it is guaranteed that the reinforcement cage cannot deviate in the lowering process; the steel reinforcement cage is hung on the cross beam through the lifting hooks, so that most of the steel reinforcement cage is kept in a vertical stretching state, and the steel reinforcement cage can be arranged more uniformly.
本发明涉及建筑工程领域,具体公开了一种钢筋笼定位架、钢筋笼定位胎架及其全荤咬合桩施工方法,包括供B桩施工的支撑单元,支撑单元包括两个定位挡块,定位挡块上设有与导墙可拆卸连接的定位件,定位挡块的一侧呈对钢筋笼弧形外壁处限位的弧形面;横梁,横梁水平设置在钢筋笼上,横梁位于两个定位挡块之间且与导墙相抵;吊钩,吊钩的一端与横梁挂扣连接,吊钩的另一端与钢筋笼挂扣连接。本方案中在进行B桩的钢筋笼的下放时,定位挡块的弧形面对钢筋笼的主筋进行限位,确保钢筋笼在下放过程中不会偏移;吊钩将钢筋笼挂在横梁上,使得钢筋笼的绝大部分保持竖直伸展状态,钢筋笼能够更均匀地布置。
Reinforcement cage positioning frame, reinforcement cage positioning jig frame and all-meat secant pile construction method thereof
The invention relates to the field of constructional engineering, and particularly discloses a reinforcement cage positioning frame, a reinforcement cage positioning jig frame and a full-meat secant pile construction method.The reinforcement cage positioning frame comprises a supporting unit for B pile construction, the supporting unit comprises two positioning check blocks, and the positioning check blocks are provided with positioning pieces detachably connected with a guide wall; one side of the positioning stop block is an arc-shaped surface for limiting the arc-shaped outer wall of the reinforcement cage; the cross beam is horizontally arranged on the reinforcement cage, and the cross beam is located between the two positioning check blocks and abuts against the guide wall; one end of the lifting hook is connected with the cross beam hanging buckle, and the other end of the lifting hook is connected with the reinforcement cage hanging buckle. According to the scheme, when the reinforcement cage of the B pile is lowered, the arc-shaped faces of the positioning stop blocks limit main reinforcements of the reinforcement cage, and it is guaranteed that the reinforcement cage cannot deviate in the lowering process; the steel reinforcement cage is hung on the cross beam through the lifting hooks, so that most of the steel reinforcement cage is kept in a vertical stretching state, and the steel reinforcement cage can be arranged more uniformly.
本发明涉及建筑工程领域,具体公开了一种钢筋笼定位架、钢筋笼定位胎架及其全荤咬合桩施工方法,包括供B桩施工的支撑单元,支撑单元包括两个定位挡块,定位挡块上设有与导墙可拆卸连接的定位件,定位挡块的一侧呈对钢筋笼弧形外壁处限位的弧形面;横梁,横梁水平设置在钢筋笼上,横梁位于两个定位挡块之间且与导墙相抵;吊钩,吊钩的一端与横梁挂扣连接,吊钩的另一端与钢筋笼挂扣连接。本方案中在进行B桩的钢筋笼的下放时,定位挡块的弧形面对钢筋笼的主筋进行限位,确保钢筋笼在下放过程中不会偏移;吊钩将钢筋笼挂在横梁上,使得钢筋笼的绝大部分保持竖直伸展状态,钢筋笼能够更均匀地布置。
Reinforcement cage positioning frame, reinforcement cage positioning jig frame and all-meat secant pile construction method thereof
一种钢筋笼定位架、钢筋笼定位胎架及其全荤咬合桩施工方法
LUO YUANYUAN (author) / LIU XIAOMIN (author) / LIU LIANG (author) / CAO HAIQING (author) / ZHOU JUNLONG (author) / GAO ZHIJUN (author) / YANG LIANGJUN (author) / WU KAI (author) / GENG WENBIN (author) / LIN XIAOJUN (author)
2024-08-30
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile foundation reinforcement cage construction positioning method
European Patent Office | 2021
|Pile foundation reinforcement cage positioning equipment and construction method thereof
European Patent Office | 2022
|European Patent Office | 2020
|Positioning fixture for pile foundation reinforcement cage
European Patent Office | 2020
|Bridge pile foundation reinforcement cage positioning device
European Patent Office | 2024
|