A platform for research: civil engineering, architecture and urbanism
The invention discloses a scaffold erecting construction method which comprises the step of erecting a floor disc buckle type scaffold and an overhanging disc buckle type scaffold. Wherein the erection of the floor plate buckle type scaffold relates to the following aspects: arrangement of a foundation, arrangement of vertical rods, arrangement of longitudinal horizontal rods, arrangement of transverse horizontal rods, arrangement of diagonal draw bars, arrangement of protective railings and operation layers, arrangement of wall connecting pieces, arrangement of scaffold boards, internal sealing of a scaffold body and arrangement of a discharging platform; erecting of the overhanging disc buckle type scaffold relates to the following aspects of overhanging beam positioning, construction requirements, overhanging steel beam arrangement at the corner of a building structure and steel wire ropes. All the steps and links are constructed according to the unified standard, so that the erecting speed of the scaffold is increased, the erecting quality is guaranteed, and safety accidents in the using process are avoided.
本发明公开了一种脚手架搭设施工方法,包括落地盘扣式脚手架和悬挑盘扣式脚手架的搭设,其中落地盘扣式脚手架的搭设涉及以下几个方面:地基基础、立杆设置、纵、横向水平杆、斜拉杆设置、防护栏杆及作业层设置、连墙件、脚手板、架体内封闭以及卸料平台;悬挑盘扣式脚手架的搭设涉及以下几个方面:悬挑梁定位、构造要求、建筑结构转角处悬挑钢梁布置、钢丝绳。使得各个步骤、环节按照统一的标准进行施工,从而提高了脚手架的搭设速度,而且保证了搭设的质量,避免在使用过程中出现安全事故。
The invention discloses a scaffold erecting construction method which comprises the step of erecting a floor disc buckle type scaffold and an overhanging disc buckle type scaffold. Wherein the erection of the floor plate buckle type scaffold relates to the following aspects: arrangement of a foundation, arrangement of vertical rods, arrangement of longitudinal horizontal rods, arrangement of transverse horizontal rods, arrangement of diagonal draw bars, arrangement of protective railings and operation layers, arrangement of wall connecting pieces, arrangement of scaffold boards, internal sealing of a scaffold body and arrangement of a discharging platform; erecting of the overhanging disc buckle type scaffold relates to the following aspects of overhanging beam positioning, construction requirements, overhanging steel beam arrangement at the corner of a building structure and steel wire ropes. All the steps and links are constructed according to the unified standard, so that the erecting speed of the scaffold is increased, the erecting quality is guaranteed, and safety accidents in the using process are avoided.
本发明公开了一种脚手架搭设施工方法,包括落地盘扣式脚手架和悬挑盘扣式脚手架的搭设,其中落地盘扣式脚手架的搭设涉及以下几个方面:地基基础、立杆设置、纵、横向水平杆、斜拉杆设置、防护栏杆及作业层设置、连墙件、脚手板、架体内封闭以及卸料平台;悬挑盘扣式脚手架的搭设涉及以下几个方面:悬挑梁定位、构造要求、建筑结构转角处悬挑钢梁布置、钢丝绳。使得各个步骤、环节按照统一的标准进行施工,从而提高了脚手架的搭设速度,而且保证了搭设的质量,避免在使用过程中出现安全事故。
Scaffold in construction site and erecting method of scaffold
European Patent Office | 2023
|Concrete steep slope scaffold foundation supporting device and scaffold erecting construction method
European Patent Office | 2021
|Composite scaffold erecting structure and construction technology thereof
European Patent Office | 2020
|