A platform for research: civil engineering, architecture and urbanism
Modularized house construction method
The invention discloses a building method of a modular house in the field of house construction, which comprises the following steps of: arranging a vertical positioning assembly on a house module according to a moving route model, arranging a horizontal positioning assembly according to the placing direction of the house module, sequentially hoisting the first floor of house module to a correct position, pushing the house module by an operator, and then hoisting the first floor of house module to the correct position. The house modules can be connected with the adjacent house assemblies through the horizontal positioning assemblies; the house module on the upper layer is hoisted to the floor, and an operator slides the house module according to the moving route model until the house module moves to the position where the house module is connected with the house module below through the vertical positioning assembly and connected with the adjacent house module through the horizontal positioning assembly; the method is used for solving the problems that in the prior art, house modules are manually moved and built, the placement positions or placement directions of the modules are prone to being wrong in the building process, consequently, follow-up hydroelectric systems cannot be normally connected, and normal use of buildings is affected.
本发明公开了房屋施工领域的一种模块化房屋的建造方法,包括根据移动路线模型在房屋模块上设置竖直定位组件,根据房屋模块的摆放方向设置水平定位组件,将首层房屋模块依次吊装至正确位置后,操作人员推动房屋模块,使得房屋模块能通过水平定位组件与相邻的房屋组件连接;将上一层房屋模块吊装至楼板上,操作人员依照移动路线模型滑动房屋模块,直至房屋模块移动至通过竖直定位组件与下方房屋模块连接,通过水平定位组件与相邻的房屋模块连接的位置,用以解决现有技术中存在的使用人工移动和搭建房屋模块,使得搭建过程中容易出现模块放置位置或摆放方向错误,从而可能使后续水电系统无法正常连接,影响建筑的正常使用。
Modularized house construction method
The invention discloses a building method of a modular house in the field of house construction, which comprises the following steps of: arranging a vertical positioning assembly on a house module according to a moving route model, arranging a horizontal positioning assembly according to the placing direction of the house module, sequentially hoisting the first floor of house module to a correct position, pushing the house module by an operator, and then hoisting the first floor of house module to the correct position. The house modules can be connected with the adjacent house assemblies through the horizontal positioning assemblies; the house module on the upper layer is hoisted to the floor, and an operator slides the house module according to the moving route model until the house module moves to the position where the house module is connected with the house module below through the vertical positioning assembly and connected with the adjacent house module through the horizontal positioning assembly; the method is used for solving the problems that in the prior art, house modules are manually moved and built, the placement positions or placement directions of the modules are prone to being wrong in the building process, consequently, follow-up hydroelectric systems cannot be normally connected, and normal use of buildings is affected.
本发明公开了房屋施工领域的一种模块化房屋的建造方法,包括根据移动路线模型在房屋模块上设置竖直定位组件,根据房屋模块的摆放方向设置水平定位组件,将首层房屋模块依次吊装至正确位置后,操作人员推动房屋模块,使得房屋模块能通过水平定位组件与相邻的房屋组件连接;将上一层房屋模块吊装至楼板上,操作人员依照移动路线模型滑动房屋模块,直至房屋模块移动至通过竖直定位组件与下方房屋模块连接,通过水平定位组件与相邻的房屋模块连接的位置,用以解决现有技术中存在的使用人工移动和搭建房屋模块,使得搭建过程中容易出现模块放置位置或摆放方向错误,从而可能使后续水电系统无法正常连接,影响建筑的正常使用。
Modularized house construction method
一种模块化房屋的建造方法
WANG ZHIQIANG (author) / CHEN SIQI (author) / MENG XIAOQI (author) / BUYIN'AOQIER (author) / WU RUOPAN (author)
2024-08-30
Patent
Electronic Resource
Chinese
Modularized house building construction method based on big data
European Patent Office | 2023
|