A platform for research: civil engineering, architecture and urbanism
Water conservancy project river channel slope protection construction method
The invention discloses a water conservancy project river channel slope protection construction method, a guide rail is fixedly arranged between two mounting frames, and an adjusting mechanism is arranged on one side of the mounting frame located on the right side. According to the water conservancy project river channel slope protection construction method, a first driving motor, a first reciprocating lead screw, a first threaded sleeve, a flexible separation mechanism, a rolling-out mechanism and a leveling mechanism are arranged between a mounting frame and a guide rail, so that the device can promote slope protection bricks to be conveyed more conveniently through cooperation; the problem that time and labor are wasted in follow-up paving due to low manual efficiency is avoided, the leveled slope is tamped and rolled in the slope protection brick transporting and paving process synchronously, the construction period is shortened through synchronous and ordered operation, the slope is leveled and filled in advance synchronously, the situation that the concave-convex difference of the slope slope is too large is avoided, and the slope protection effect is improved. And subsequent tamping and flattening are not convenient.
本发明公开了水利工程河道护坡施工方法,所述导轨固定设置于两个安装架之间,位于右侧所述安装架的一侧设置有调节机构,本发明涉及水利工程技术领域。该水利工程河道护坡施工方法,通过在安装架和导轨之间设置第一驱动电机、第一往复丝杠、第一螺纹套、灵活分离机构、碾平机构和平整机构,使得装置能够通过上述协同配合,促使护坡砖的输送更加便捷,避免人工效率低导致后续铺装费时费力的问题,以及运输和铺装护坡砖过程同步对平整后的边坡进行夯实和碾平,通过同步有序作业,减少工期时长,以及同步对边坡进行预先平整填补,避免边坡斜面凹凸差异过大,导致后续夯实碾平不便的问题。
Water conservancy project river channel slope protection construction method
The invention discloses a water conservancy project river channel slope protection construction method, a guide rail is fixedly arranged between two mounting frames, and an adjusting mechanism is arranged on one side of the mounting frame located on the right side. According to the water conservancy project river channel slope protection construction method, a first driving motor, a first reciprocating lead screw, a first threaded sleeve, a flexible separation mechanism, a rolling-out mechanism and a leveling mechanism are arranged between a mounting frame and a guide rail, so that the device can promote slope protection bricks to be conveyed more conveniently through cooperation; the problem that time and labor are wasted in follow-up paving due to low manual efficiency is avoided, the leveled slope is tamped and rolled in the slope protection brick transporting and paving process synchronously, the construction period is shortened through synchronous and ordered operation, the slope is leveled and filled in advance synchronously, the situation that the concave-convex difference of the slope slope is too large is avoided, and the slope protection effect is improved. And subsequent tamping and flattening are not convenient.
本发明公开了水利工程河道护坡施工方法,所述导轨固定设置于两个安装架之间,位于右侧所述安装架的一侧设置有调节机构,本发明涉及水利工程技术领域。该水利工程河道护坡施工方法,通过在安装架和导轨之间设置第一驱动电机、第一往复丝杠、第一螺纹套、灵活分离机构、碾平机构和平整机构,使得装置能够通过上述协同配合,促使护坡砖的输送更加便捷,避免人工效率低导致后续铺装费时费力的问题,以及运输和铺装护坡砖过程同步对平整后的边坡进行夯实和碾平,通过同步有序作业,减少工期时长,以及同步对边坡进行预先平整填补,避免边坡斜面凹凸差异过大,导致后续夯实碾平不便的问题。
Water conservancy project river channel slope protection construction method
水利工程河道护坡施工方法
QU WEN (author) / DONG XIANQIANG (author) / HU HAO (author) / SUN TING (author) / WANG YANLING (author) / ZHAI HUIJIE (author)
2024-09-03
Patent
Electronic Resource
Chinese
Water conservancy project river channel slope protection construction method
European Patent Office | 2023
|Water conservancy project river channel slope protection laying construction method
European Patent Office | 2024
|River channel slope protection laying construction method for water conservancy project
European Patent Office | 2022
|Water conservancy project river channel protection slope
European Patent Office | 2024
|River channel slope protection laying construction method for water conservancy project
European Patent Office | 2022
|