The invention discloses a berth pile sinking construction method, which belongs to the technical field of building construction.The berth pile sinking construction method comprises the steps that a pile driving platform used for pile sinking operation and a trestle used for transporting piles are erected, and the trestle is located on one side of the pile driving platform; a pile guiding mechanism is arranged between the pile driving platform and the trestle and used for guiding the pipe piles from the trestle to the pile driving position of the pile driving platform; a to-be-constructed pipe pile is conveyed to the position close to the piling position of the piling platform through the trestle, the lower portion of the pipe pile is connected with the pile guiding mechanism, the upper portion of the pipe pile is connected with the hoisting equipment, the hoisting equipment hoists the pipe pile to erect, and under the traction acting force of the pile guiding mechanism and/or the power effect of the hoisting equipment, the pipe pile is hoisted. The tubular pile moves to a piling position of the piling platform in a state that the upper end is lifted and the lower end is dragged; and the pipe pile is driven to the set depth. The pile guiding mechanism is designed for berth pile sinking construction, the stability, accuracy and speed of hoisting and transferring the pipe pile to a pile driving position are improved, and the construction efficiency is improved.
本发明公开了一种泊位沉桩施工方法,属于建筑施工技术领域,其包括:搭设用于沉桩作业的打桩平台和用于运桩的栈桥,栈桥位于打桩平台一侧;在打桩平台和栈桥之间设置引桩机构,用于将管桩从栈桥引导至打桩平台打桩位;待施工管桩通过栈桥运送至靠近打桩平台打桩位的位置,将管桩下部与引桩机构连接,管桩上部与起重设备连接,起重设备起吊使得管桩立起,在引桩机构的牵引作用力和/或起重设备的动力作用下,管桩以上端起吊下端被牵引的状态移动至打桩平台打桩位;将管桩打入至设定深度。本发明为泊位沉桩施工设计引桩机构,提高管桩起吊转运至打桩位的稳定性、准确性和速度,提高施工效率。
The invention discloses a berth pile sinking construction method, which belongs to the technical field of building construction.The berth pile sinking construction method comprises the steps that a pile driving platform used for pile sinking operation and a trestle used for transporting piles are erected, and the trestle is located on one side of the pile driving platform; a pile guiding mechanism is arranged between the pile driving platform and the trestle and used for guiding the pipe piles from the trestle to the pile driving position of the pile driving platform; a to-be-constructed pipe pile is conveyed to the position close to the piling position of the piling platform through the trestle, the lower portion of the pipe pile is connected with the pile guiding mechanism, the upper portion of the pipe pile is connected with the hoisting equipment, the hoisting equipment hoists the pipe pile to erect, and under the traction acting force of the pile guiding mechanism and/or the power effect of the hoisting equipment, the pipe pile is hoisted. The tubular pile moves to a piling position of the piling platform in a state that the upper end is lifted and the lower end is dragged; and the pipe pile is driven to the set depth. The pile guiding mechanism is designed for berth pile sinking construction, the stability, accuracy and speed of hoisting and transferring the pipe pile to a pile driving position are improved, and the construction efficiency is improved.
本发明公开了一种泊位沉桩施工方法,属于建筑施工技术领域,其包括:搭设用于沉桩作业的打桩平台和用于运桩的栈桥,栈桥位于打桩平台一侧;在打桩平台和栈桥之间设置引桩机构,用于将管桩从栈桥引导至打桩平台打桩位;待施工管桩通过栈桥运送至靠近打桩平台打桩位的位置,将管桩下部与引桩机构连接,管桩上部与起重设备连接,起重设备起吊使得管桩立起,在引桩机构的牵引作用力和/或起重设备的动力作用下,管桩以上端起吊下端被牵引的状态移动至打桩平台打桩位;将管桩打入至设定深度。本发明为泊位沉桩施工设计引桩机构,提高管桩起吊转运至打桩位的稳定性、准确性和速度,提高施工效率。
Wind power single pile, pile sinking construction device and pile sinking construction method