Construction method for local settlement treatment of urban fill road
The invention discloses a construction method for local settlement treatment of an urban fill road, and the construction method comprises the following specific steps: S100, surveying settlement of a road subgrade on site, determining the treatment range of the local settlement subgrade, and planning the excavation position of an operation well according to the treatment range of the settlement subgrade; s200, a construction range is delimited according to the planned construction position of the operation well outside the subgrade range of the local settlement of the road, and a fence is built around the construction site; sequentially excavating operation wells according to the planned positions; s300, holes are drilled in the roadbed from the interior of the constructed operation well through a horizontal directional drill; a drill bit is connected with a mud jacking pipe or a water accumulation pipe during punching, so that the horizontal directional drill is driven into the mud jacking pipe or the water accumulation pipe at the local settlement section of the roadbed; a mud jacking pipe or a water accumulation pipe is installed in each operation well; and S400, a mud jacking pump is installed in the operation well provided with the mud jacking pipe, and the mud jacking pump is connected with the mud jacking pipe.
本发明公开了一种城镇填方道路局部沉降处理的施工方法,该施工方法的具体步骤如下:S100、现场对道路路基沉降勘察,确定局部沉降路基的处理范围,并且根据沉降路基处理范围规划好操作井开挖的位置;S200、在道路局部沉降的路基范围外,根据规划好的操作井施工位置划定施工范围,并在施工场地周围建立围挡;然后按照规划位置依次开挖操作井;S300、从施工完成的操作井内部利用水平定向钻向路基中打孔;在打孔的同时将钻头连接压浆管或者积水管,使得水平定向钻在路基局部沉降段打入压浆管或者积水管;在每个操作井内部安装压浆管或者积水管;S400、在设有压浆管的操作井中安装压浆泵,并将压浆泵与压浆管相连。
Construction method for local settlement treatment of urban fill road
The invention discloses a construction method for local settlement treatment of an urban fill road, and the construction method comprises the following specific steps: S100, surveying settlement of a road subgrade on site, determining the treatment range of the local settlement subgrade, and planning the excavation position of an operation well according to the treatment range of the settlement subgrade; s200, a construction range is delimited according to the planned construction position of the operation well outside the subgrade range of the local settlement of the road, and a fence is built around the construction site; sequentially excavating operation wells according to the planned positions; s300, holes are drilled in the roadbed from the interior of the constructed operation well through a horizontal directional drill; a drill bit is connected with a mud jacking pipe or a water accumulation pipe during punching, so that the horizontal directional drill is driven into the mud jacking pipe or the water accumulation pipe at the local settlement section of the roadbed; a mud jacking pipe or a water accumulation pipe is installed in each operation well; and S400, a mud jacking pump is installed in the operation well provided with the mud jacking pipe, and the mud jacking pump is connected with the mud jacking pipe.
本发明公开了一种城镇填方道路局部沉降处理的施工方法,该施工方法的具体步骤如下:S100、现场对道路路基沉降勘察,确定局部沉降路基的处理范围,并且根据沉降路基处理范围规划好操作井开挖的位置;S200、在道路局部沉降的路基范围外,根据规划好的操作井施工位置划定施工范围,并在施工场地周围建立围挡;然后按照规划位置依次开挖操作井;S300、从施工完成的操作井内部利用水平定向钻向路基中打孔;在打孔的同时将钻头连接压浆管或者积水管,使得水平定向钻在路基局部沉降段打入压浆管或者积水管;在每个操作井内部安装压浆管或者积水管;S400、在设有压浆管的操作井中安装压浆泵,并将压浆泵与压浆管相连。
Construction method for local settlement treatment of urban fill road
一种城镇填方道路局部沉降处理的施工方法
LI GUOHUA (author) / WANG DAN (author) / YANG ZHIJUN (author)
2024-09-13
Patent
Electronic Resource
Chinese
Settlement treatment grouting device for high fill construction foundation
European Patent Office | 2024
|High-fill site terrace settlement treatment method and treatment structure
European Patent Office | 2021
|British Library Conference Proceedings | 1994
|Construction of hydraulic fill road embankment
Engineering Index Backfile | 1926
European Patent Office | 2020
|