A platform for research: civil engineering, architecture and urbanism
Oversized gabion throwing construction method
The invention discloses a throwing construction method for a super-heavy gabion. The throwing construction method comprises the following steps that the gabion is machined; transforming the ship body; the machined gabions are hoisted to a movable frame which is located on a ship deck and can slide on the conveying rail; the ship body is driven to a gabion leaning position of the steel open caisson, and the ship body is positioned through the platform positioning frame for temporary stopping; a lifting hook assembly of the lifting frame is hooked to the gabion, and the first winch is started to pull the movable frame to move forwards to the outside of the deck on the conveying rail; and the movable frame is limited at the preset position, the second winch is started to hoist the gabion through a lifting hook assembly of the lifting frame for lowering, the gabion is lowered to the designated position to be released, and gabion throwing is completed.
本发明公开一种超大重量石笼抛设施工方法,包括以下步骤:加工石笼;改造船体;将加工好的石笼吊装至船体甲板上位于运输轨道上可滑动的移动架上;将船体开至钢沉井的石笼靠设处,利用平台定位架定位船体进行临时停靠;将所述吊架的吊钩组件钩挂所述石笼,启动所述第一卷扬机拉动移动架在运输轨道上前移至甲板外;将移动架限位在预定位置,启动所述第二卷扬机通过吊架的吊钩组件吊起石笼进行下放,将石笼下放至指定位置释放石笼,完成石笼抛设。
Oversized gabion throwing construction method
The invention discloses a throwing construction method for a super-heavy gabion. The throwing construction method comprises the following steps that the gabion is machined; transforming the ship body; the machined gabions are hoisted to a movable frame which is located on a ship deck and can slide on the conveying rail; the ship body is driven to a gabion leaning position of the steel open caisson, and the ship body is positioned through the platform positioning frame for temporary stopping; a lifting hook assembly of the lifting frame is hooked to the gabion, and the first winch is started to pull the movable frame to move forwards to the outside of the deck on the conveying rail; and the movable frame is limited at the preset position, the second winch is started to hoist the gabion through a lifting hook assembly of the lifting frame for lowering, the gabion is lowered to the designated position to be released, and gabion throwing is completed.
本发明公开一种超大重量石笼抛设施工方法,包括以下步骤:加工石笼;改造船体;将加工好的石笼吊装至船体甲板上位于运输轨道上可滑动的移动架上;将船体开至钢沉井的石笼靠设处,利用平台定位架定位船体进行临时停靠;将所述吊架的吊钩组件钩挂所述石笼,启动所述第一卷扬机拉动移动架在运输轨道上前移至甲板外;将移动架限位在预定位置,启动所述第二卷扬机通过吊架的吊钩组件吊起石笼进行下放,将石笼下放至指定位置释放石笼,完成石笼抛设。
Oversized gabion throwing construction method
超大重量石笼抛设施工方法
YANG JIAYI (author) / LIANG CHAO (author) / WU JUNGUO (author) / LI YONGHAI (author) / YU XIUPING (author) / CEN FENG (author) / PENG BO (author) / MAO LONG (author) / CHEN WENYIN (author) / HE XIAODONG (author)
2024-09-13
Patent
Electronic Resource
Chinese