Pile foundation construction method capable of reducing sediment
The invention relates to the field of pile foundation construction, in particular to a pile foundation construction method for reducing sediment, which comprises the following steps: S1, drilling; s2, water is injected into the holes; s3, a sediment cleaning device is put into the hole, the sediment cleaning device comprises a rack, a cleaning box and a stirring shaft, stirring blades are fixedly arranged at the bottom of the stirring shaft, a shaft hole is formed in the cleaning box, the stirring shaft penetrates through the shaft hole, and the cleaning box can vertically move along the stirring shaft; the bottom of the cleaning box is provided with an opening and a sealing plate movably arranged at the bottom of the cleaning box. S4, the sediment is stirred through a stirring shaft, and the sediment and water are mixed to form slurry; s5, enabling the opening to be in an open state, enabling the cleaning box to move downwards, and enabling the slurry to enter the cleaning box through the opening; s6, an opening is closed through a closing plate, and then the cleaning box is lifted upwards; and S7, the opening is opened, and the flowing-out slurry is received. By means of the scheme, the problem that water is wasted during sediment cleaning at present is solved, and the sediment treatment efficiency is improved.
本发明涉及桩基施工领域,具体涉及一种减少沉渣的桩基施工方法,包括以下步骤:S1、钻孔;S2、向孔中注入水;S3、将沉渣清理装置下放到孔中,沉渣清理装置包括机架、清理箱和搅拌轴,搅拌轴的底部固定设有搅拌叶,清理箱上设有轴孔,搅拌轴从轴孔中穿过,且清理箱能够沿搅拌轴竖向移动,清理箱的底部设有开口以及活动设置于清理箱的底部的封闭板;S4、搅拌轴对沉渣进行搅拌,使沉渣和水混合形成泥浆;S5、使开口处于打开状态,使清理箱向下移动,泥浆通过开口进入到清理箱中;S6、使封闭板将开口关闭,然后将清理箱向上提起;S7、打开开口,对流出的泥浆进行接收。通过本方案,解决了现目前沉渣清理较为浪费水的问题,提高沉渣处理效率。
Pile foundation construction method capable of reducing sediment
The invention relates to the field of pile foundation construction, in particular to a pile foundation construction method for reducing sediment, which comprises the following steps: S1, drilling; s2, water is injected into the holes; s3, a sediment cleaning device is put into the hole, the sediment cleaning device comprises a rack, a cleaning box and a stirring shaft, stirring blades are fixedly arranged at the bottom of the stirring shaft, a shaft hole is formed in the cleaning box, the stirring shaft penetrates through the shaft hole, and the cleaning box can vertically move along the stirring shaft; the bottom of the cleaning box is provided with an opening and a sealing plate movably arranged at the bottom of the cleaning box. S4, the sediment is stirred through a stirring shaft, and the sediment and water are mixed to form slurry; s5, enabling the opening to be in an open state, enabling the cleaning box to move downwards, and enabling the slurry to enter the cleaning box through the opening; s6, an opening is closed through a closing plate, and then the cleaning box is lifted upwards; and S7, the opening is opened, and the flowing-out slurry is received. By means of the scheme, the problem that water is wasted during sediment cleaning at present is solved, and the sediment treatment efficiency is improved.
本发明涉及桩基施工领域,具体涉及一种减少沉渣的桩基施工方法,包括以下步骤:S1、钻孔;S2、向孔中注入水;S3、将沉渣清理装置下放到孔中,沉渣清理装置包括机架、清理箱和搅拌轴,搅拌轴的底部固定设有搅拌叶,清理箱上设有轴孔,搅拌轴从轴孔中穿过,且清理箱能够沿搅拌轴竖向移动,清理箱的底部设有开口以及活动设置于清理箱的底部的封闭板;S4、搅拌轴对沉渣进行搅拌,使沉渣和水混合形成泥浆;S5、使开口处于打开状态,使清理箱向下移动,泥浆通过开口进入到清理箱中;S6、使封闭板将开口关闭,然后将清理箱向上提起;S7、打开开口,对流出的泥浆进行接收。通过本方案,解决了现目前沉渣清理较为浪费水的问题,提高沉渣处理效率。
Pile foundation construction method capable of reducing sediment
一种减少沉渣的桩基施工方法
YANG HAO (author) / CHEN TIAN (author) / LI GUO (author) / FAN ZHIJUN (author) / WANG MINGTAO (author) / ZHOU SHIJUN (author) / LI JUNSONG (author) / LAN BIGUAN (author) / AI QING (author) / LIU BIN (author)
2024-09-17
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2015
|Pile foundation hole sediment cleaning construction method and construction device
European Patent Office | 2022
|Prefabricated foundation pile body capable of reducing negative friction
European Patent Office | 2023
|Pile foundation construction platform and pile foundation construction method
European Patent Office | 2020
|