Fabricated building outer wall PC seam treatment method
The invention discloses an assembly type building outer wall PC seam treatment method, and relates to the technical field of assembly type outer wall building construction, and the method comprises an early-stage design stage, a resident supervision stage, a structure construction stage and an outer wall construction stage; the outer wall construction stage comprises prefabricated part abutted seam treatment and facing treatment; the operation method for processing the abutted seam of the prefabricated part comprises the following steps of: firstly, pre-processing the abutted seam of an over-wide or over-narrow outer wall part before gluing; the abutted seam is cleaned up before gluing, and a primary coating treatment is added to the gluing part, so that the connection stability of the sealant and the base layer is improved; in the aspects of the early-stage design stage, the resident supervision stage, the structure construction stage and the outer wall construction stage, the design requirements are changed, the workpiece manufacturing precision is improved, the construction technology is improved, the deviation of PC seam design and manufacturing is reduced, and the sealing performance and stability of seam splicing are effectively improved.
本发明公开了装配式建筑外墙PC缝处理方法,涉及装配式外墙建筑施工技术领域,其包括前期设计阶段、驻厂监造阶段、结构施工阶段和外墙施工阶段;所述外墙施工阶段包括预制构件拼缝处理和饰面处理;预制构件拼缝处理的操作方法:是先对过宽或过窄的外墙构件拼缝进行打胶前的预处理;打胶前拼缝清理干净,打胶部位增加一道底涂处理,增加密封胶与基层的连接稳定性;本发明通过在前期设计阶段、驻厂监造阶段、结构施工阶段和外墙施工阶段的各方面,以改变设计要求,提高工件制造精度改善施工工艺等方式,降低PC缝设计制造的偏差,有效提高拼缝的密封性和稳定性。
Fabricated building outer wall PC seam treatment method
The invention discloses an assembly type building outer wall PC seam treatment method, and relates to the technical field of assembly type outer wall building construction, and the method comprises an early-stage design stage, a resident supervision stage, a structure construction stage and an outer wall construction stage; the outer wall construction stage comprises prefabricated part abutted seam treatment and facing treatment; the operation method for processing the abutted seam of the prefabricated part comprises the following steps of: firstly, pre-processing the abutted seam of an over-wide or over-narrow outer wall part before gluing; the abutted seam is cleaned up before gluing, and a primary coating treatment is added to the gluing part, so that the connection stability of the sealant and the base layer is improved; in the aspects of the early-stage design stage, the resident supervision stage, the structure construction stage and the outer wall construction stage, the design requirements are changed, the workpiece manufacturing precision is improved, the construction technology is improved, the deviation of PC seam design and manufacturing is reduced, and the sealing performance and stability of seam splicing are effectively improved.
本发明公开了装配式建筑外墙PC缝处理方法,涉及装配式外墙建筑施工技术领域,其包括前期设计阶段、驻厂监造阶段、结构施工阶段和外墙施工阶段;所述外墙施工阶段包括预制构件拼缝处理和饰面处理;预制构件拼缝处理的操作方法:是先对过宽或过窄的外墙构件拼缝进行打胶前的预处理;打胶前拼缝清理干净,打胶部位增加一道底涂处理,增加密封胶与基层的连接稳定性;本发明通过在前期设计阶段、驻厂监造阶段、结构施工阶段和外墙施工阶段的各方面,以改变设计要求,提高工件制造精度改善施工工艺等方式,降低PC缝设计制造的偏差,有效提高拼缝的密封性和稳定性。
Fabricated building outer wall PC seam treatment method
装配式建筑外墙PC缝处理方法
GAN RUIKAI (author) / XU HONGYI (author) / QIAN RONGKUN (author) / HUANG HAO (author) / WU SANZI (author) / ZHANG YA (author) / WU YU (author) / YU YANG (author) / WANG LIANGKUAN (author) / HUANG NAN (author)
2024-09-17
Patent
Electronic Resource
Chinese
Fabricated plate building outer wall connecting seam treatment method
European Patent Office | 2023
|Fabricated plate building outer wall connecting seam treatment equipment
European Patent Office | 2023
|Fabricated integrated outer wall splicing seam treatment method
European Patent Office | 2022
|Fabricated building outer wall abutted seam intelligent gluing equipment
European Patent Office | 2023
|Fabricated outer wall abutted seam anti-seepage construction method
European Patent Office | 2023
|