A platform for research: civil engineering, architecture and urbanism
Wall formwork heightening device and manufacturing and mounting process
The invention discloses a wall formwork heightening device and a manufacturing and installing technology in the technical field of formwork adjusting.The wall formwork heightening device comprises a steel plate, two threaded rings are fixedly connected to the steel plate, a threaded rod is in threaded connection between the two threaded rings, a nut is installed at one end of the threaded rod, four fixing holes are formed in the steel plate, and four telescopic rods are fixedly connected to the steel plate; a placing frame is fixedly connected to the telescopic rod, four fixing nails are movably connected to the steel plate, two sliding grooves are formed in the steel plate, a supporting mechanism is arranged in the sliding grooves, a fixing plate is fixedly connected to the supporting mechanism, a power mechanism is arranged on the supporting mechanism, four elastic mechanisms are arranged between the steel plate and the fixing plate, and four knocking rods are fixedly connected to the fixing plate. A knocking block is mounted at one end of the knocking rod, a fixing mechanism is arranged between the knocking rod and the placement frame, and two suction cups are arranged on the rear side of the steel plate, so that the equipment is more convenient to adjust, and the use convenience of the equipment is further improved.
本发明公开了模板调节技术领域的墙模板调高器及制作安装工艺,包括钢板,钢板上固定连接有两个螺纹环,两个螺纹环之间螺纹连接有螺纹杆,螺纹杆一端安装有螺母,钢板上开设有四个固定孔,钢板上固定连接有四个伸缩杆,伸缩杆上固定连接有放置架,钢板上活动连接有四个固定钉,钢板上开设有两个滑槽,滑槽内设有支撑机构,支撑机构上固定连接有固定板,支撑机构上设有动力机构,钢板和固定板之间设有四个弹性机构,固定板上固定连接有四个敲击杆,敲击杆一端安装有敲击块,敲击杆和放置架之间设有固定机构,钢板后侧设有两个吸盘,使设备在调节时更加的方便,进一步提高了其使用便捷性。
Wall formwork heightening device and manufacturing and mounting process
The invention discloses a wall formwork heightening device and a manufacturing and installing technology in the technical field of formwork adjusting.The wall formwork heightening device comprises a steel plate, two threaded rings are fixedly connected to the steel plate, a threaded rod is in threaded connection between the two threaded rings, a nut is installed at one end of the threaded rod, four fixing holes are formed in the steel plate, and four telescopic rods are fixedly connected to the steel plate; a placing frame is fixedly connected to the telescopic rod, four fixing nails are movably connected to the steel plate, two sliding grooves are formed in the steel plate, a supporting mechanism is arranged in the sliding grooves, a fixing plate is fixedly connected to the supporting mechanism, a power mechanism is arranged on the supporting mechanism, four elastic mechanisms are arranged between the steel plate and the fixing plate, and four knocking rods are fixedly connected to the fixing plate. A knocking block is mounted at one end of the knocking rod, a fixing mechanism is arranged between the knocking rod and the placement frame, and two suction cups are arranged on the rear side of the steel plate, so that the equipment is more convenient to adjust, and the use convenience of the equipment is further improved.
本发明公开了模板调节技术领域的墙模板调高器及制作安装工艺,包括钢板,钢板上固定连接有两个螺纹环,两个螺纹环之间螺纹连接有螺纹杆,螺纹杆一端安装有螺母,钢板上开设有四个固定孔,钢板上固定连接有四个伸缩杆,伸缩杆上固定连接有放置架,钢板上活动连接有四个固定钉,钢板上开设有两个滑槽,滑槽内设有支撑机构,支撑机构上固定连接有固定板,支撑机构上设有动力机构,钢板和固定板之间设有四个弹性机构,固定板上固定连接有四个敲击杆,敲击杆一端安装有敲击块,敲击杆和放置架之间设有固定机构,钢板后侧设有两个吸盘,使设备在调节时更加的方便,进一步提高了其使用便捷性。
Wall formwork heightening device and manufacturing and mounting process
墙模板调高器及制作安装工艺
MENG FANKAI (author) / HOU FEI (author) / GENG DEZHI (author) / GUO XIAOFENG (author) / ZHANG BAOJIAN (author) / WANG CHAO (author) / ZHENG GUOSONG (author)
2024-09-17
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Wall top heightening structure and mounting mode thereof
European Patent Office | 2023
|Concrete diaphragm wall cofferdam body heightening device
European Patent Office | 2024
|