A platform for research: civil engineering, architecture and urbanism
Intelligent pump station water supply equipment
The invention discloses intelligent pump station water supply equipment, relates to the technical field of water supply equipment, and adopts the technical scheme that the intelligent pump station water supply equipment comprises a protective shell, a water inlet pipe is arranged outside the protective shell, a surge tank is communicated outside the water inlet pipe, three booster pumps are arranged outside the surge tank, filter pipes are fixedly connected outside the booster pumps, and filter elements are arranged inside the filter pipes; according to the invention, the water flow flows into the pressure stabilizing tank through the water inlet pipe, then enters the booster pump through the pressure stabilizing tank and flows into the filter pipe through pressurization of the booster pump, and the filter element is arranged in the filter pipe, so that the flowing water flow can be filtered; and high-pressure water flow can generate vibration when passing through the water outlet pipe, vibration formed by impact of the high-pressure water flow can be effectively absorbed through the vibration reduction mechanism arranged outside the water outlet pipe, and the service life of the device is prolonged.
本发明公开了一种智慧泵站供水设备,涉及供水设备技术领域,其技术方案包括保护壳体,保护壳体外部设置有入水管,入水管外部连通有稳压罐,稳压罐外部设置有三个增压泵,增压泵外部固定连接有过滤管,过滤管内部设置有滤芯,通过滤芯可对通过的水流进行过滤,本发明中,水流通过入水管流入稳压罐内部,接着通过稳压罐进入到增压泵内,经过增压泵的增压流入过滤管,而过滤管的内部设置有滤芯,可对流过的水流进行过滤,而高压的水流从出水管通过时会产生震动,而通过设置在出水管外部的减振机构可有效吸收高压水流冲击形成的震动,提高了装置的使用寿命。
Intelligent pump station water supply equipment
The invention discloses intelligent pump station water supply equipment, relates to the technical field of water supply equipment, and adopts the technical scheme that the intelligent pump station water supply equipment comprises a protective shell, a water inlet pipe is arranged outside the protective shell, a surge tank is communicated outside the water inlet pipe, three booster pumps are arranged outside the surge tank, filter pipes are fixedly connected outside the booster pumps, and filter elements are arranged inside the filter pipes; according to the invention, the water flow flows into the pressure stabilizing tank through the water inlet pipe, then enters the booster pump through the pressure stabilizing tank and flows into the filter pipe through pressurization of the booster pump, and the filter element is arranged in the filter pipe, so that the flowing water flow can be filtered; and high-pressure water flow can generate vibration when passing through the water outlet pipe, vibration formed by impact of the high-pressure water flow can be effectively absorbed through the vibration reduction mechanism arranged outside the water outlet pipe, and the service life of the device is prolonged.
本发明公开了一种智慧泵站供水设备,涉及供水设备技术领域,其技术方案包括保护壳体,保护壳体外部设置有入水管,入水管外部连通有稳压罐,稳压罐外部设置有三个增压泵,增压泵外部固定连接有过滤管,过滤管内部设置有滤芯,通过滤芯可对通过的水流进行过滤,本发明中,水流通过入水管流入稳压罐内部,接着通过稳压罐进入到增压泵内,经过增压泵的增压流入过滤管,而过滤管的内部设置有滤芯,可对流过的水流进行过滤,而高压的水流从出水管通过时会产生震动,而通过设置在出水管外部的减振机构可有效吸收高压水流冲击形成的震动,提高了装置的使用寿命。
Intelligent pump station water supply equipment
一种智慧泵站供水设备
TIAN MING (author) / GAN XIAOQING (author) / WANG JINGFENG (author) / HE LIANG (author) / DENG YANG (author) / BAI GE (author) / GUO WEI (author) / XIA FANFAN (author) / LI BAIQIANG (author) / LI TINGGE (author)
2024-09-20
Patent
Electronic Resource
Chinese
Digital frequency conversion intelligent pump station water supply equipment
European Patent Office | 2023
|Water supply guarantee system of intelligent pump station
European Patent Office | 2023
|Buried integrated intelligent water supply prefabricated pump station
European Patent Office | 2020
|Peak shifting water supply method for intelligent water supply pump station
European Patent Office | 2024
|