Construction method for assembling and lifting arched bridge cross beam
The invention discloses a construction method for assembling and lifting an arched bridge cross beam, and relates to the technical field of arched bridge construction, in particular to the construction method for assembling and lifting the arched bridge cross beam, which comprises the following specific steps: step 1, planning a construction site; 2, planning a construction environment; 3, engineering project difficulty analysis and coping measure preparation; 4, construction deployment is carried out; the construction deployment comprises structural member assembly deployment, hoisting equipment deployment and constructor deployment; and 5, a cross beam assembly refreshing construction process is carried out. According to the construction method for assembling and lifting the arched bridge cross beam, better stability and a more systematized lifting process are achieved in the assembling and lifting process of the arched bridge cross beam, the stepping degree of the cross beam in the lifting period is ensured, and the lifting stage is divided into three parts of lifting preparation, trial lifting and formal lifting; in this way, the smoothness in the lifting process is guaranteed, and difficult problems in the assembly process are reduced as much as possible.
本发明公开了拱形桥梁横梁装配提升用施工方法,涉及拱形桥梁建设技术领域,具体为拱形桥梁横梁装配提升用施工方法,包括以下具体步骤:步骤一:施工现场规划;步骤二:施工环境规划;步骤三:工程项目难点分析及应对措施准备;步骤四:施工部署;施工部署包括结构件装配部署、吊装设备部署、施工人员部署;步骤五:横梁装配提神施工流程。该拱形桥梁横梁装配提升用施工方法,在对拱形桥梁横梁的装配提升过程中具有更好的稳定性以及更加系统化的提升流程,确保横梁提升期间的步进程度,并且其提升阶段分为提升准备、试提升、正式提升三部分,以此保障提升过程中流畅性,尽可能的减少装配工艺过程中的难点问题出现。
Construction method for assembling and lifting arched bridge cross beam
The invention discloses a construction method for assembling and lifting an arched bridge cross beam, and relates to the technical field of arched bridge construction, in particular to the construction method for assembling and lifting the arched bridge cross beam, which comprises the following specific steps: step 1, planning a construction site; 2, planning a construction environment; 3, engineering project difficulty analysis and coping measure preparation; 4, construction deployment is carried out; the construction deployment comprises structural member assembly deployment, hoisting equipment deployment and constructor deployment; and 5, a cross beam assembly refreshing construction process is carried out. According to the construction method for assembling and lifting the arched bridge cross beam, better stability and a more systematized lifting process are achieved in the assembling and lifting process of the arched bridge cross beam, the stepping degree of the cross beam in the lifting period is ensured, and the lifting stage is divided into three parts of lifting preparation, trial lifting and formal lifting; in this way, the smoothness in the lifting process is guaranteed, and difficult problems in the assembly process are reduced as much as possible.
本发明公开了拱形桥梁横梁装配提升用施工方法,涉及拱形桥梁建设技术领域,具体为拱形桥梁横梁装配提升用施工方法,包括以下具体步骤:步骤一:施工现场规划;步骤二:施工环境规划;步骤三:工程项目难点分析及应对措施准备;步骤四:施工部署;施工部署包括结构件装配部署、吊装设备部署、施工人员部署;步骤五:横梁装配提神施工流程。该拱形桥梁横梁装配提升用施工方法,在对拱形桥梁横梁的装配提升过程中具有更好的稳定性以及更加系统化的提升流程,确保横梁提升期间的步进程度,并且其提升阶段分为提升准备、试提升、正式提升三部分,以此保障提升过程中流畅性,尽可能的减少装配工艺过程中的难点问题出现。
Construction method for assembling and lifting arched bridge cross beam
拱形桥梁横梁装配提升用施工方法
MA CHENG (author) / KANG WEI (author) / SUN WENSHU (author) / WEI DONG (author) / CHEN JIANGUANG (author) / WANG ZHIMING (author) / MA BEN (author) / HUANG ZEDONG (author) / WANG MIN (author) / SI SHANGCHI (author)
2024-09-24
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Concrete in Arched bridge construction
Engineering Index Backfile | 1909
|Arched low-pier continuous beam bridge foundation and construction method
European Patent Office | 2023
|