Rapid positioning construction method for jetty wharf berthing piece
The invention discloses a quick positioning construction method for a berthing piece of a jetty wharf, which belongs to the technical field of wharf construction and comprises the following specific steps: S1, fixing a supporting seat for supporting the berthing piece on a cast-in-place pile through a hoop mechanism; s2, the position, in the y-axis direction, of the berthing piece is positioned through a limiting assembly; s3, the two sides, in the x-axis direction, of the berthing piece are clamped and positioned through a clamping assembly; s4, the heights of the two hoop mechanisms of the cast-in-place piles located on the two sides in the y-axis direction are positioned through a y-axis positioning assembly; s5, the heights of the two adjacent hoop mechanisms located on the same side in the x-axis direction are positioned through an x-axis positioning assembly; and S6, after the heights of the adjacent hoop mechanisms in the y-axis direction and the x-axis direction are positioned in sequence, positioning construction of the berthing piece is completed. The positioning device has the beneficial effects that the berthing piece can be conveniently and rapidly positioned to the height position during pouring, and the working efficiency is improved.
本发明公开了一种突堤码头靠船件快速定位施工方法,属于码头施工的技术领域,其包括具体以下步骤:S1,通过抱箍机构将对靠船件进行支撑的支撑座固定于灌注桩;S2,通过限位组件对靠船件y轴方向的所在位置进行定位;S3,通过夹持组件对靠船件x轴方向的两侧进行夹持定位;S4,通过y轴定位组件对分别位于y轴方向两侧灌注桩的两抱箍机构的所在高度进行定位;S5,通过x轴定位组件对x轴方向相邻两组且位于同侧的两抱箍机构所在高度进行定位;S6,依次对各y轴方向和x轴方向相邻的抱箍机构所在高度定位后,完成对靠船件的定位施工。本申请具有便于快速将靠船件定位至浇筑时的所在高度位置,提高工作效率的效果。
Rapid positioning construction method for jetty wharf berthing piece
The invention discloses a quick positioning construction method for a berthing piece of a jetty wharf, which belongs to the technical field of wharf construction and comprises the following specific steps: S1, fixing a supporting seat for supporting the berthing piece on a cast-in-place pile through a hoop mechanism; s2, the position, in the y-axis direction, of the berthing piece is positioned through a limiting assembly; s3, the two sides, in the x-axis direction, of the berthing piece are clamped and positioned through a clamping assembly; s4, the heights of the two hoop mechanisms of the cast-in-place piles located on the two sides in the y-axis direction are positioned through a y-axis positioning assembly; s5, the heights of the two adjacent hoop mechanisms located on the same side in the x-axis direction are positioned through an x-axis positioning assembly; and S6, after the heights of the adjacent hoop mechanisms in the y-axis direction and the x-axis direction are positioned in sequence, positioning construction of the berthing piece is completed. The positioning device has the beneficial effects that the berthing piece can be conveniently and rapidly positioned to the height position during pouring, and the working efficiency is improved.
本发明公开了一种突堤码头靠船件快速定位施工方法,属于码头施工的技术领域,其包括具体以下步骤:S1,通过抱箍机构将对靠船件进行支撑的支撑座固定于灌注桩;S2,通过限位组件对靠船件y轴方向的所在位置进行定位;S3,通过夹持组件对靠船件x轴方向的两侧进行夹持定位;S4,通过y轴定位组件对分别位于y轴方向两侧灌注桩的两抱箍机构的所在高度进行定位;S5,通过x轴定位组件对x轴方向相邻两组且位于同侧的两抱箍机构所在高度进行定位;S6,依次对各y轴方向和x轴方向相邻的抱箍机构所在高度定位后,完成对靠船件的定位施工。本申请具有便于快速将靠船件定位至浇筑时的所在高度位置,提高工作效率的效果。
Rapid positioning construction method for jetty wharf berthing piece
一种突堤码头靠船件快速定位施工方法
CUI YULIANG (author) / SHANG YANTAO (author) / HU ZHONGSHENG (author) / WANG CHENGWU (author) / XU XIANG (author) / MENG BO (author) / WEI KANG (author) / YANG SHENGLONG (author) / YU XIAOYU (author) / LI HUI (author)
2024-09-24
Patent
Electronic Resource
Chinese