A platform for research: civil engineering, architecture and urbanism
Scaffold connector structure and connecting method thereof
The invention discloses a scaffold connector structure and a connecting method thereof.The connector structure comprises a first column body, the first column body comprises a first column body, an insertion opening and a groove body, the insertion opening is formed in the side wall of the first column body, the groove body is formed in the first column body, and the insertion opening communicates with the groove body; the second column body comprises a second column body and an insertion block, the insertion block is installed on the second column body, and the insertion block is matched with the insertion opening in shape so that the insertion block can be inserted into the groove body through the insertion opening; the groove body is configured to enable the insertion block to rotate in the groove body, and the insertion block can be attached to the inner wall of the groove body after rotating and clamped on the insertion opening. The inserting block penetrates through the inserting opening and goes deep into the groove body so as to achieve rapid butt joint between the first column body and the second column body, the connecting steps are simplified, tools and time needed during installation are reduced, and the construction efficiency is improved.
本发明公开了一种脚手架接口结构及其连接方法,其中,接口结构包括第一柱体,第一柱体包括第一柱体本体、插口和槽体,插口设置在第一柱体本体侧壁上,槽体设置在第一柱体本体内,插口和槽体相连通;第二柱体,第二柱体包括第二柱体本体和插块,插块安装在第二柱体本体上,插块与插口形状相适配,以使插块能够通过插口插入槽体内;槽体被配置为能够使插块在槽体内转动,插块转动后能够贴合槽体内壁,并卡在插口上。本发明中插块穿过插口并深入槽体,以实现第一柱体与第二柱体之间的快速对接,不仅简化连接步骤,还减少安装时所需的工具和时间,提高施工效率。
Scaffold connector structure and connecting method thereof
The invention discloses a scaffold connector structure and a connecting method thereof.The connector structure comprises a first column body, the first column body comprises a first column body, an insertion opening and a groove body, the insertion opening is formed in the side wall of the first column body, the groove body is formed in the first column body, and the insertion opening communicates with the groove body; the second column body comprises a second column body and an insertion block, the insertion block is installed on the second column body, and the insertion block is matched with the insertion opening in shape so that the insertion block can be inserted into the groove body through the insertion opening; the groove body is configured to enable the insertion block to rotate in the groove body, and the insertion block can be attached to the inner wall of the groove body after rotating and clamped on the insertion opening. The inserting block penetrates through the inserting opening and goes deep into the groove body so as to achieve rapid butt joint between the first column body and the second column body, the connecting steps are simplified, tools and time needed during installation are reduced, and the construction efficiency is improved.
本发明公开了一种脚手架接口结构及其连接方法,其中,接口结构包括第一柱体,第一柱体包括第一柱体本体、插口和槽体,插口设置在第一柱体本体侧壁上,槽体设置在第一柱体本体内,插口和槽体相连通;第二柱体,第二柱体包括第二柱体本体和插块,插块安装在第二柱体本体上,插块与插口形状相适配,以使插块能够通过插口插入槽体内;槽体被配置为能够使插块在槽体内转动,插块转动后能够贴合槽体内壁,并卡在插口上。本发明中插块穿过插口并深入槽体,以实现第一柱体与第二柱体之间的快速对接,不仅简化连接步骤,还减少安装时所需的工具和时间,提高施工效率。
Scaffold connector structure and connecting method thereof
一种脚手架接口结构及其连接方法
LUO GUOZHANG (author) / JI MENGHUI (author) / ZHANG LIWEN (author) / KE HANNAN (author) / ZHONG LIFENG (author) / XU RUIFENG (author) / ZHANG XIRONG (author) / ZOU QINGLIN (author) / SONG SHAOZHI (author) / WU HENGJIAN (author)
2024-09-27
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Turnbuckle scaffold connecting structure and application method thereof
European Patent Office | 2022
|