A platform for research: civil engineering, architecture and urbanism
Concrete building template for civil engineering of transformer substation
The invention relates to the field of concrete building templates, and discloses a concrete building template for civil engineering of a transformer substation, the concrete building template comprises a first main plate, the outer wall of the first main plate is slidably connected with a second main plate, the lower surface of the first main plate is fixedly connected with a base, and the upper surface of the base is fixedly connected with a filter box; a first conveying pump is fixedly connected to the upper surface of the base, a first extraction pipe is fixedly connected to the input end of the first conveying pump, the outer wall of the first extraction pipe is fixedly connected to the interior of a first main plate, a cooling pipe is fixedly connected to one end of the outer wall of the first extraction pipe, and a plurality of branch pipes are fixedly connected to the interior of the cooling pipe. The output end of the first conveying pump is fixedly connected with a first conveying pipe. Through cooperation of the base, the filter box, the first delivery pump, the first extraction pipe, the second delivery pipe, a filter screen, a sealing block, a cooling pipe and a branch pipe, the effects of accelerating the hardening process of concrete and shortening the construction period through circulating cooling liquid are achieved.
本申请涉及混凝土建筑模板领域,公开了一种变电站土建工程用混凝土建筑模板,包括主板一,所述主板一的外壁滑动连接有主板二,所述主板一的下表面固定连接有底座,所述底座的上表面固定连接有过滤箱,所述底座的上表面固定连接有输送泵一,所述输送泵一的输入端固定连接有抽取管一,所述抽取管一的外壁固定连接在主板一的内部,所述抽取管一的外壁一端固定连接有冷却管,所述冷却管的内部固定连接有多个分支管,所述输送泵一的输出端固定连接有输送管一。通过底座、过滤箱、输送泵一、抽取管一、输送管二、滤网、密封块、冷却管和分支管之间的配合,达到了通过循环冷却液体来加速混凝土的硬化过程,缩短工期的作用。
Concrete building template for civil engineering of transformer substation
The invention relates to the field of concrete building templates, and discloses a concrete building template for civil engineering of a transformer substation, the concrete building template comprises a first main plate, the outer wall of the first main plate is slidably connected with a second main plate, the lower surface of the first main plate is fixedly connected with a base, and the upper surface of the base is fixedly connected with a filter box; a first conveying pump is fixedly connected to the upper surface of the base, a first extraction pipe is fixedly connected to the input end of the first conveying pump, the outer wall of the first extraction pipe is fixedly connected to the interior of a first main plate, a cooling pipe is fixedly connected to one end of the outer wall of the first extraction pipe, and a plurality of branch pipes are fixedly connected to the interior of the cooling pipe. The output end of the first conveying pump is fixedly connected with a first conveying pipe. Through cooperation of the base, the filter box, the first delivery pump, the first extraction pipe, the second delivery pipe, a filter screen, a sealing block, a cooling pipe and a branch pipe, the effects of accelerating the hardening process of concrete and shortening the construction period through circulating cooling liquid are achieved.
本申请涉及混凝土建筑模板领域,公开了一种变电站土建工程用混凝土建筑模板,包括主板一,所述主板一的外壁滑动连接有主板二,所述主板一的下表面固定连接有底座,所述底座的上表面固定连接有过滤箱,所述底座的上表面固定连接有输送泵一,所述输送泵一的输入端固定连接有抽取管一,所述抽取管一的外壁固定连接在主板一的内部,所述抽取管一的外壁一端固定连接有冷却管,所述冷却管的内部固定连接有多个分支管,所述输送泵一的输出端固定连接有输送管一。通过底座、过滤箱、输送泵一、抽取管一、输送管二、滤网、密封块、冷却管和分支管之间的配合,达到了通过循环冷却液体来加速混凝土的硬化过程,缩短工期的作用。
Concrete building template for civil engineering of transformer substation
一种变电站土建工程用混凝土建筑模板
WANG ZHIQIANG (author) / WANG YANG (author) / DUAN ZHENQIU (author) / FENG YANG (author) / LIU NAIXIN (author)
2024-09-27
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete mixing device for civil engineering site of transformer substation
European Patent Office | 2022
|Template fixing equipment for civil construction of transformer substation
European Patent Office | 2024
|Concrete building template for civil engineering road engineering
European Patent Office | 2023
|Building template fixing device for transformer substation infrastructure
European Patent Office | 2022
|