Water distribution wall prefabrication construction method
The invention relates to a prefabrication construction method for a water distribution wall. The prefabrication construction method comprises the following steps that S1, the water distribution wall is segmented; s2, a pool body main body structure and a lower solid water distribution wall are poured, a post-pouring belt is reserved at the joint of the pool body main body structure and the upper water distribution wall with the holes when the pool body main body structure is poured, and a full-length secondary grouting groove is reserved in the top face of the lower solid water distribution wall when the lower solid water distribution wall is poured; s3, prefabricating a water distribution wall with holes in the upper part; s4, the upper water distribution wall with holes is hoisted and installed on the upper portion of the lower solid water distribution wall; s5, steel plates are welded to the main steel bars of the post-cast strip, and bolts penetrate through the steel plates and then are connected and fastened with the pre-embedded threaded sleeves on the side face of the water distribution wall with the holes in the upper portion; s6, sealing the post-cast strip template; s7, concrete is poured on the post-cast strip; and S8, a micro-expansion grouting material is poured into the secondary grouting groove. The water distribution wall with the holes in the upper portion is prefabricated and then installed in an assembly mode, the water distribution wall with the holes in the upper portion is prefabricated and produced, concrete vibration is easy, and the forming quality is high.
本发明涉及一种布水墙预制施工方法,包括以下步骤:S1:对布水墙进行分段;S2:浇筑池体主体结构以及下部实心布水墙,浇筑池体主体结构时在其与上部带孔布水墙连接处预留后浇带,浇筑下部实心布水墙时在其顶面预留一条通长的二次灌浆槽;S3:预制上部带孔布水墙;S4:吊装上部带孔布水墙,将其安装于下部实心布水墙的上部;S5:在后浇带的主钢筋上焊接钢板,螺栓穿过钢板后与上部带孔布水墙侧面的预埋螺纹套筒连接紧固;S6:后浇带模板封模;S7:后浇带浇筑混凝土;S8:二次灌浆槽内灌入微膨胀灌浆料。本发明上部带孔布水墙预制,再将其装配式安装,上部带孔布水墙预制生产,混凝土振捣容易,成型质量高。
Water distribution wall prefabrication construction method
The invention relates to a prefabrication construction method for a water distribution wall. The prefabrication construction method comprises the following steps that S1, the water distribution wall is segmented; s2, a pool body main body structure and a lower solid water distribution wall are poured, a post-pouring belt is reserved at the joint of the pool body main body structure and the upper water distribution wall with the holes when the pool body main body structure is poured, and a full-length secondary grouting groove is reserved in the top face of the lower solid water distribution wall when the lower solid water distribution wall is poured; s3, prefabricating a water distribution wall with holes in the upper part; s4, the upper water distribution wall with holes is hoisted and installed on the upper portion of the lower solid water distribution wall; s5, steel plates are welded to the main steel bars of the post-cast strip, and bolts penetrate through the steel plates and then are connected and fastened with the pre-embedded threaded sleeves on the side face of the water distribution wall with the holes in the upper portion; s6, sealing the post-cast strip template; s7, concrete is poured on the post-cast strip; and S8, a micro-expansion grouting material is poured into the secondary grouting groove. The water distribution wall with the holes in the upper portion is prefabricated and then installed in an assembly mode, the water distribution wall with the holes in the upper portion is prefabricated and produced, concrete vibration is easy, and the forming quality is high.
本发明涉及一种布水墙预制施工方法,包括以下步骤:S1:对布水墙进行分段;S2:浇筑池体主体结构以及下部实心布水墙,浇筑池体主体结构时在其与上部带孔布水墙连接处预留后浇带,浇筑下部实心布水墙时在其顶面预留一条通长的二次灌浆槽;S3:预制上部带孔布水墙;S4:吊装上部带孔布水墙,将其安装于下部实心布水墙的上部;S5:在后浇带的主钢筋上焊接钢板,螺栓穿过钢板后与上部带孔布水墙侧面的预埋螺纹套筒连接紧固;S6:后浇带模板封模;S7:后浇带浇筑混凝土;S8:二次灌浆槽内灌入微膨胀灌浆料。本发明上部带孔布水墙预制,再将其装配式安装,上部带孔布水墙预制生产,混凝土振捣容易,成型质量高。
Water distribution wall prefabrication construction method
一种布水墙预制施工方法
SONG WENZHI (author) / YANG XIAOWEI (author) / AN BIN (author) / LIU YIN (author) / HONG CHENCHAO (author) / GUO FENG (author)
2024-10-01
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E03F
SEWERS
,
Abwasserkanäle
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Prefabrication speeds wall erection
Engineering Index Backfile | 1938
Building exterior wall construction method using prefabrication steel module
European Patent Office | 2024
|Prefabrication speeds wall erection
Engineering Index Backfile | 1938
Prefabrication reinforcement structure of reinforced concrete wall-type structure construction wall
European Patent Office | 2023
|