A platform for research: civil engineering, architecture and urbanism
Post-consolidation installation method for special-shaped steel structure
The invention discloses a post-consolidation mounting method for a special-shaped steel structure, which is applied to the technical field of constructional engineering construction, a rod end hinge assembly comprises a hinge end and a rigid short plate, a positioning bolt is mounted on the surface of the hinge end, the middle of the hinge end is hinged to the rigid short plate, the rigid short plate is inclined, and the positioning bolt is mounted on the surface of the hinge end. A first pin shaft is arranged at the hinged position of the rigid short plate and the hinged end, the rear consolidation rod piece assembly comprises a short beam and a third connecting block, the third connecting block is fixed to the left diagonal web member after the hinged device is detached, the upper end of the left diagonal web member is fixed to the lower end of a first connecting block, and the lower end of the first connecting block is fixed to the lower end of a second connecting block. The right end of the short beam is connected with the left end of the left side lower chord member, the left end of the short beam is fixed to the core tube steel column, the angle steel is arranged at the fixing position of the left end of the short beam, the reinforcing ribs are installed on the upper portion and the lower portion of the short beam for reinforcement, and according to the installation method, the influence of vertical deformation difference on the structure in the construction process is reduced, and the installation precision is improved.
本发明公开了一种异形钢结构后固结安装方法,应用于建筑工程施工技术领域,所述杆端铰接组件包括有铰接端和刚性短板,所述铰接端的表面安装有定位螺栓,所述铰接端的中间与刚性短板进行铰接,所述刚性短板为斜向,所述刚性短板与铰接端的铰接处设置有第一销轴,所述后固结杆件组件包括有短梁和连接块三,所述连接块三在铰接装置拆除后与左斜腹杆进行固定,所述左斜腹杆的上端固定在连接块一的下端,所述短梁的右端与左侧下弦杆的左端连接,所述短梁的左端固定在核心筒钢柱上,所述短梁的左端固定处设置有角钢,所述短梁的上下方均安装有加强筋进行加固,该安装方法降低了施工过程中竖向变形差对结构的影响,提高了安装精度。
Post-consolidation installation method for special-shaped steel structure
The invention discloses a post-consolidation mounting method for a special-shaped steel structure, which is applied to the technical field of constructional engineering construction, a rod end hinge assembly comprises a hinge end and a rigid short plate, a positioning bolt is mounted on the surface of the hinge end, the middle of the hinge end is hinged to the rigid short plate, the rigid short plate is inclined, and the positioning bolt is mounted on the surface of the hinge end. A first pin shaft is arranged at the hinged position of the rigid short plate and the hinged end, the rear consolidation rod piece assembly comprises a short beam and a third connecting block, the third connecting block is fixed to the left diagonal web member after the hinged device is detached, the upper end of the left diagonal web member is fixed to the lower end of a first connecting block, and the lower end of the first connecting block is fixed to the lower end of a second connecting block. The right end of the short beam is connected with the left end of the left side lower chord member, the left end of the short beam is fixed to the core tube steel column, the angle steel is arranged at the fixing position of the left end of the short beam, the reinforcing ribs are installed on the upper portion and the lower portion of the short beam for reinforcement, and according to the installation method, the influence of vertical deformation difference on the structure in the construction process is reduced, and the installation precision is improved.
本发明公开了一种异形钢结构后固结安装方法,应用于建筑工程施工技术领域,所述杆端铰接组件包括有铰接端和刚性短板,所述铰接端的表面安装有定位螺栓,所述铰接端的中间与刚性短板进行铰接,所述刚性短板为斜向,所述刚性短板与铰接端的铰接处设置有第一销轴,所述后固结杆件组件包括有短梁和连接块三,所述连接块三在铰接装置拆除后与左斜腹杆进行固定,所述左斜腹杆的上端固定在连接块一的下端,所述短梁的右端与左侧下弦杆的左端连接,所述短梁的左端固定在核心筒钢柱上,所述短梁的左端固定处设置有角钢,所述短梁的上下方均安装有加强筋进行加固,该安装方法降低了施工过程中竖向变形差对结构的影响,提高了安装精度。
Post-consolidation installation method for special-shaped steel structure
一种异形钢结构后固结安装方法
WANG GANG (author) / NIU HUI (author) / YANG FENG (author) / LU LEI (author) / CHEN HUA (author) / PAN JUNJUN (author) / LIU TIANYING (author) / SHEN SHIPENG (author) / JUNG SAM-YUN (author) / ZHAO XU (author)
2024-10-01
Patent
Electronic Resource
Chinese
Steel structure special-shaped platform bridge and installation method
European Patent Office | 2020
|Installation method of large-span steel truss overhanging special-shaped structure
European Patent Office | 2023
|Complex special-shaped steel structure glass curtain wall and installation method thereof
European Patent Office | 2024
|European Patent Office | 2024
|Rapid installation method of special-shaped GRP structure
European Patent Office | 2021
|