A platform for research: civil engineering, architecture and urbanism
Digging and slag conveying construction distribution structure of rubblization building foundation
The invention discloses an excavation and slag conveying construction distribution structure of a rubblization building foundation. The excavation and slag conveying construction distribution structure comprises a distribution structure body, wherein a material receiving hopper can move between the position away from a conveying assembly and the position above the conveying assembly. The installation support and the conveying assembly are installed in the foundation pit, the situation that the construction space of the foundation pit is excessively occupied by outwards-expanded bevel edges on the two sides of a construction road is avoided, the receiving hopper is far away from the conveying assembly when the receiving hopper is in butt joint with the excavation operation vehicle for crushing petrochemical waste soil, and a bucket of the excavation operation vehicle can be turned over freely to pour materials and cannot collide with the conveying assembly; and the problem that in the prior art, a stone crusher in butt joint with the muck is installed at the feeding position of the bottom end of a conveying tower, and the conveying tower is prone to being collided and damaged when an excavation hopper turns over to pour materials is solved.
本申请公开了一种碎石化建筑基础的挖掘输渣施工分布结构,包括:接料斗能实现在远离输送组件位置至输送组件上方位置之间进行位移的分布结构。安装支架、输送组件安装在基础基坑内,不会出现施工便道两侧有外扩斜边过多占用基础基坑施工空间的情况,接料斗与挖掘作业车对接碎石化渣土时远离输送组件,能实现挖掘作业车铲斗任意翻转倒料不会与输送组件发生撞击,倒料溢出的碎石化渣土也不会与输送组件发生撞击,解决了现有技术对接渣土的碎石器安装于传送塔底端进料处,在挖掘料斗翻转倒料时容易撞击传送塔出现损坏的问题。
Digging and slag conveying construction distribution structure of rubblization building foundation
The invention discloses an excavation and slag conveying construction distribution structure of a rubblization building foundation. The excavation and slag conveying construction distribution structure comprises a distribution structure body, wherein a material receiving hopper can move between the position away from a conveying assembly and the position above the conveying assembly. The installation support and the conveying assembly are installed in the foundation pit, the situation that the construction space of the foundation pit is excessively occupied by outwards-expanded bevel edges on the two sides of a construction road is avoided, the receiving hopper is far away from the conveying assembly when the receiving hopper is in butt joint with the excavation operation vehicle for crushing petrochemical waste soil, and a bucket of the excavation operation vehicle can be turned over freely to pour materials and cannot collide with the conveying assembly; and the problem that in the prior art, a stone crusher in butt joint with the muck is installed at the feeding position of the bottom end of a conveying tower, and the conveying tower is prone to being collided and damaged when an excavation hopper turns over to pour materials is solved.
本申请公开了一种碎石化建筑基础的挖掘输渣施工分布结构,包括:接料斗能实现在远离输送组件位置至输送组件上方位置之间进行位移的分布结构。安装支架、输送组件安装在基础基坑内,不会出现施工便道两侧有外扩斜边过多占用基础基坑施工空间的情况,接料斗与挖掘作业车对接碎石化渣土时远离输送组件,能实现挖掘作业车铲斗任意翻转倒料不会与输送组件发生撞击,倒料溢出的碎石化渣土也不会与输送组件发生撞击,解决了现有技术对接渣土的碎石器安装于传送塔底端进料处,在挖掘料斗翻转倒料时容易撞击传送塔出现损坏的问题。
Digging and slag conveying construction distribution structure of rubblization building foundation
一种碎石化建筑基础的挖掘输渣施工分布结构
CHENG HONGQUAN (author) / WANG WEI (author) / LIU QUANCHONG (author) / JIANG BO (author) / LIU YU (author) / LI XU (author) / CAI XINYUAN (author) / HU LINGZHI (author) / LIN DENGHUI (author) / LI XINRUI (author)
2024-10-11
Patent
Electronic Resource
Chinese
British Library Online Contents | 2000
Taylor & Francis Verlag | 2002
|Rubblization of Concrete Pavements
British Library Online Contents | 1999
|Rubblization of Concrete Pavements
British Library Conference Proceedings | 1999
|