A platform for research: civil engineering, architecture and urbanism
Construction method of corrugated pipe penetrating through post-tensioned prestressed tendon
The invention relates to a construction method for a corrugated pipe penetrating through a post-tensioning method prestressed tendon, and belongs to the technical field of building construction. The construction method comprises the following steps that S1, beam steel bars are bound and accepted through supervision; s2, corrugated pipes are laid, specifically, after beam steel bars are installed, the corrugated pipes are laid, the adjacent corrugated pipes are connected through corrugated pipe connecting devices, and meanwhile the corrugated pipes and the beam steel bars are fixed through the corrugated pipe connecting devices; s3, strand pulling of the prestressed tendons is conducted, specifically, the prestressed tendons are inserted into the corrugated pipes; and S4, grouting bleeding holes are formed, specifically, the bleeding holes are formed in the corrugated pipe, and the bleeding holes communicate with the corrugated pipe connecting device. The method has the effect of reducing the construction difficulty.
本申请涉及一种穿后张法预应力筋的波纹管的施工方法,属于建筑施工的技术领域,其包括以下步骤:S1、梁钢筋绑扎,并经过监理验收;S2、铺放波纹管:梁钢筋安装完成后,铺设波纹管,使用波纹管连接装置连接相邻波纹管,同时使用波纹管连接装置将波纹管和梁钢筋固定;S3、预应力筋穿束:将预应力筋穿入波纹管中;S4、设置灌浆泌水孔设置:在波纹管上设置泌水孔,泌水孔和波纹管连接装置相通。本申请具有降低施工难度的效果。
Construction method of corrugated pipe penetrating through post-tensioned prestressed tendon
The invention relates to a construction method for a corrugated pipe penetrating through a post-tensioning method prestressed tendon, and belongs to the technical field of building construction. The construction method comprises the following steps that S1, beam steel bars are bound and accepted through supervision; s2, corrugated pipes are laid, specifically, after beam steel bars are installed, the corrugated pipes are laid, the adjacent corrugated pipes are connected through corrugated pipe connecting devices, and meanwhile the corrugated pipes and the beam steel bars are fixed through the corrugated pipe connecting devices; s3, strand pulling of the prestressed tendons is conducted, specifically, the prestressed tendons are inserted into the corrugated pipes; and S4, grouting bleeding holes are formed, specifically, the bleeding holes are formed in the corrugated pipe, and the bleeding holes communicate with the corrugated pipe connecting device. The method has the effect of reducing the construction difficulty.
本申请涉及一种穿后张法预应力筋的波纹管的施工方法,属于建筑施工的技术领域,其包括以下步骤:S1、梁钢筋绑扎,并经过监理验收;S2、铺放波纹管:梁钢筋安装完成后,铺设波纹管,使用波纹管连接装置连接相邻波纹管,同时使用波纹管连接装置将波纹管和梁钢筋固定;S3、预应力筋穿束:将预应力筋穿入波纹管中;S4、设置灌浆泌水孔设置:在波纹管上设置泌水孔,泌水孔和波纹管连接装置相通。本申请具有降低施工难度的效果。
Construction method of corrugated pipe penetrating through post-tensioned prestressed tendon
一种穿后张法预应力筋的波纹管的施工方法
WANG DUOXUAN (author) / LIU FEI (author) / CHEN HAO (author) / LI YANQIU (author) / ZHOU CHENGWEN (author) / WANG ZONGLIN (author) / LI XIAOHAN (author) / CHI PENGMENG (author) / GONG SHAOWU (author) / WANG YUZE (author)
2024-10-11
Patent
Electronic Resource
Chinese
Post-tensioned prestressed Concrete
TIBKAT | 1981
|Copper tailing powder post-tensioned prestressed pipe grouting agent
European Patent Office | 2021
|Quality control method for post-tensioned prestressed beam construction
European Patent Office | 2022
|Large-space-span post-tensioned prestressed beam construction method
European Patent Office | 2021
|Post-Tensioned Prestressed Masonry Columns
ASCE | 2001
|