A platform for research: civil engineering, architecture and urbanism
Karst roadbed treatment system and karst roadbed treatment process
The invention discloses a karst roadbed treatment system and a process thereof, and relates to the field of karst roadbed treatment. A crane lifts a strut to be located above the opening surface of karst, one end of a connecting rope penetrates through a second through groove of a second positioning steel bar, then the two ends of the connecting rope penetrate through first through grooves, and by pulling the two ends of the connecting rope, the karst roadbed treatment system and the karst roadbed treatment process are completed. The second positioning steel bar is inserted into the first through groove in the first positioning structure, after insertion, the telescopic structure is shortened, the first positioning structure is located on the opening face of the second connecting groove, and the telescopic structure drives the supporting column to move downwards together in the shortening process. The positioning and connecting efficiency of the supporting column can be improved, the supporting column can be rapidly and conveniently fixed, and the concrete pouring quality is improved.
本发明公开了一种岩溶路基处理系统及其工艺,涉及岩溶路基处理领域,吊车将支柱吊起,位于岩溶的开口面上方,将连接绳的一端穿过第二定位钢筋的第二通槽,然后将连接绳的两端均穿过第一通槽,通过拉动连接绳的两端,第二定位钢筋插入第一定位结构上的第一通槽,插入后,伸缩结构缩短,使第一定位结构位于第二连接槽的开口面上,伸缩结构缩短的过程中带动支柱一起向下移动。本发明能提高支柱定位连接的效率,快速便捷的固定支柱,并提高混凝土浇注的质量。
Karst roadbed treatment system and karst roadbed treatment process
The invention discloses a karst roadbed treatment system and a process thereof, and relates to the field of karst roadbed treatment. A crane lifts a strut to be located above the opening surface of karst, one end of a connecting rope penetrates through a second through groove of a second positioning steel bar, then the two ends of the connecting rope penetrate through first through grooves, and by pulling the two ends of the connecting rope, the karst roadbed treatment system and the karst roadbed treatment process are completed. The second positioning steel bar is inserted into the first through groove in the first positioning structure, after insertion, the telescopic structure is shortened, the first positioning structure is located on the opening face of the second connecting groove, and the telescopic structure drives the supporting column to move downwards together in the shortening process. The positioning and connecting efficiency of the supporting column can be improved, the supporting column can be rapidly and conveniently fixed, and the concrete pouring quality is improved.
本发明公开了一种岩溶路基处理系统及其工艺,涉及岩溶路基处理领域,吊车将支柱吊起,位于岩溶的开口面上方,将连接绳的一端穿过第二定位钢筋的第二通槽,然后将连接绳的两端均穿过第一通槽,通过拉动连接绳的两端,第二定位钢筋插入第一定位结构上的第一通槽,插入后,伸缩结构缩短,使第一定位结构位于第二连接槽的开口面上,伸缩结构缩短的过程中带动支柱一起向下移动。本发明能提高支柱定位连接的效率,快速便捷的固定支柱,并提高混凝土浇注的质量。
Karst roadbed treatment system and karst roadbed treatment process
一种岩溶路基处理系统及其工艺
SUN JIAQI (author) / YU QINGBANG (author) / ZHANG XING (author) / NIE JIANXING (author) / XU XINYANG (author) / XUE XIANFENG (author) / JI YUHENG (author) / DAI PENGWEI (author) / WANG DAQIANG (author) / LI MINGYANG (author)
2024-10-15
Patent
Electronic Resource
Chinese
Karst roadbed stiff film bag pile comprehensive treatment method
European Patent Office | 2022
|European Patent Office | 2015
|