Method for installing cantilever beam on self-elevating drilling platform wharf
The invention relates to the technical field of cantilever beam installation, and discloses a self-elevating drilling platform wharf cantilever beam installation method which comprises the following steps: S1, hoisting preparation; s2, starting to hoist; s3, floating crane ship moving; s4, moving the ship in place; s5, starting hoisting; and S6, hoisting is completed. According to the design method for the wharf installation cantilever beam of the self-elevating drilling platform, the problems that the main hull part cannot be lifted to the required height and the cantilever beam cannot slide to the main hull in a sliding mode when installation is carried out in a dock and a pile leg lifting system and a locking system are not debugged are solved; and through a floating crane hoisting mode, a floating crane needs to enter a dock, the time of occupying the dock is long, and the construction of other projects is influenced.
本发明涉及悬臂梁安装技术领域,且公开了自升式钻井平台码头安装悬臂梁方法,安装悬臂梁方法,包括:S1,吊装准备;S2,开始起吊;S3,浮吊移船;S4,移船就位;S5,吊装开始;S6,吊装完成等步骤。该自升式钻井平台码头安装悬臂梁设计方法,解决了船坞内安装,在桩腿升降系统和锁紧系统没有完成调试的情况下,主船体部分没法升至需要的高度,悬臂梁无法通过滑移的方式滑移上主船体;以及通过浮吊吊装的方式,浮吊要进入船坞,会占用的船坞时间较长,会影响到其他项目的建造的情况。
Method for installing cantilever beam on self-elevating drilling platform wharf
The invention relates to the technical field of cantilever beam installation, and discloses a self-elevating drilling platform wharf cantilever beam installation method which comprises the following steps: S1, hoisting preparation; s2, starting to hoist; s3, floating crane ship moving; s4, moving the ship in place; s5, starting hoisting; and S6, hoisting is completed. According to the design method for the wharf installation cantilever beam of the self-elevating drilling platform, the problems that the main hull part cannot be lifted to the required height and the cantilever beam cannot slide to the main hull in a sliding mode when installation is carried out in a dock and a pile leg lifting system and a locking system are not debugged are solved; and through a floating crane hoisting mode, a floating crane needs to enter a dock, the time of occupying the dock is long, and the construction of other projects is influenced.
本发明涉及悬臂梁安装技术领域,且公开了自升式钻井平台码头安装悬臂梁方法,安装悬臂梁方法,包括:S1,吊装准备;S2,开始起吊;S3,浮吊移船;S4,移船就位;S5,吊装开始;S6,吊装完成等步骤。该自升式钻井平台码头安装悬臂梁设计方法,解决了船坞内安装,在桩腿升降系统和锁紧系统没有完成调试的情况下,主船体部分没法升至需要的高度,悬臂梁无法通过滑移的方式滑移上主船体;以及通过浮吊吊装的方式,浮吊要进入船坞,会占用的船坞时间较长,会影响到其他项目的建造的情况。
Method for installing cantilever beam on self-elevating drilling platform wharf
自升式钻井平台码头安装悬臂梁方法
YANG HANKUN (author) / ZHOU BO (author) / DU YUCHUN (author) / LI CHUNHUI (author)
2024-10-15
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Self-elevating type drilling platform cantilever beam carrying method
European Patent Office | 2020
|Wharf pile pulling analytical method for self-elevating drilling platform
European Patent Office | 2015
|Sliding installation device and method for cantilever beam of self-elevating drilling platform
European Patent Office | 2020
|