Construction method for overlapping reinforced high-rise fabricated building construction aluminum mold
The invention discloses a construction method for overlapping and enhancing a high-rise fabricated building construction aluminum mold, which belongs to a high-rise building construction method, and comprises the following steps of: installing a movable operation platform, and hoisting an aluminum mold vertical rod by adopting a special transportation device. A special aluminum alloy base is adopted, a shear wall aluminum mold inclined supporting rod, a cast-in-place connecting beam, a laminated slab strip and a laminated slab aluminum mold supporting rod are adjusted and finely adjusted, the perpendicularity and the elevation of an aluminum mold are preliminarily and accurately controlled, determined and controlled, a shear wall is cast in place at the end of an assembly type laminated slab, steel bars below the bottom of the laminated slab and the laminated slab are firstly installed on the cast-in-place connecting beam, and a prefabricated stair is hoisted; and steel bars above the bottom of the laminated slab are installed. And installing the combined guide wall device. The technical problems of structure leakage, slab staggering, deviation quality, progress and safety are solved.
本发明公开了一种用于叠合增强高层装配式建筑施工铝模施工方法,属于高层建筑施工方法,包括以下步骤:安装可移动操作平台,采用专用运输装置吊运铝模立杆。采用专用铝合金底座,调整微调剪力墙铝模斜支撑杆、现浇连梁、叠合板带、叠合板铝模支撑杆,初步、精确控制确定控制铝模垂直度、标高,装配式叠合板端部现浇剪力墙、现浇连梁先安装叠合板板底以下钢筋,叠合板、预制楼梯吊装,安装叠合板板底以上钢筋。组合导墙装置安装。本发明解决了结构渗漏、错台、偏位质量、进度,安全的技术问题。
Construction method for overlapping reinforced high-rise fabricated building construction aluminum mold
The invention discloses a construction method for overlapping and enhancing a high-rise fabricated building construction aluminum mold, which belongs to a high-rise building construction method, and comprises the following steps of: installing a movable operation platform, and hoisting an aluminum mold vertical rod by adopting a special transportation device. A special aluminum alloy base is adopted, a shear wall aluminum mold inclined supporting rod, a cast-in-place connecting beam, a laminated slab strip and a laminated slab aluminum mold supporting rod are adjusted and finely adjusted, the perpendicularity and the elevation of an aluminum mold are preliminarily and accurately controlled, determined and controlled, a shear wall is cast in place at the end of an assembly type laminated slab, steel bars below the bottom of the laminated slab and the laminated slab are firstly installed on the cast-in-place connecting beam, and a prefabricated stair is hoisted; and steel bars above the bottom of the laminated slab are installed. And installing the combined guide wall device. The technical problems of structure leakage, slab staggering, deviation quality, progress and safety are solved.
本发明公开了一种用于叠合增强高层装配式建筑施工铝模施工方法,属于高层建筑施工方法,包括以下步骤:安装可移动操作平台,采用专用运输装置吊运铝模立杆。采用专用铝合金底座,调整微调剪力墙铝模斜支撑杆、现浇连梁、叠合板带、叠合板铝模支撑杆,初步、精确控制确定控制铝模垂直度、标高,装配式叠合板端部现浇剪力墙、现浇连梁先安装叠合板板底以下钢筋,叠合板、预制楼梯吊装,安装叠合板板底以上钢筋。组合导墙装置安装。本发明解决了结构渗漏、错台、偏位质量、进度,安全的技术问题。
Construction method for overlapping reinforced high-rise fabricated building construction aluminum mold
一种用于叠合增强高层装配式建筑施工铝模施工方法
ZHAO JIAGUI (author) / HE BIAO (author) / DAI BO (author) / CHEN XIAOXIAO (author)
2024-10-15
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Aluminum mold mounting method for high-rise fabricated building
European Patent Office | 2024
|European Patent Office | 2024
|Fabricated building aluminum mold based on BIM technology and construction method
European Patent Office | 2023
|Fabricated unloading platform for high-rise building construction
European Patent Office | 2020
|Aluminum mold slurry leakage prevention structure of fabricated building and construction method
European Patent Office | 2024
|