A platform for research: civil engineering, architecture and urbanism
Concrete construction vibrating device and construction method
The concrete construction vibrating device is characterized in that vertical grooves are formed in the left side wall and the right side wall of an inner cavity of a bearing frame, a plurality of motors are evenly and fixedly arranged at the front end of the top of the bearing frame from left to right, and a rubber pipe is fixedly arranged at the bottom of each motor; and the bottom of each rubber pipe penetrates through the bottom of the bearing frame and is fixedly provided with a vibrating rod, and a protective cover is fixedly arranged at the rear end of the top of the bearing frame. According to the concrete construction vibrating device and the construction method, through mutual cooperation of the vertical grooves, the distance adjusting mechanisms, the vibrating rods and the lead screws, the distance adjusting mechanisms are operated in advance, the distance between the adjacent vibrating rods can be changed at equal intervals, and therefore the distance between the adjacent vibrating rods can be flexibly and rapidly adjusted; and a constructor can quickly adjust the layout of the vibrating rod according to the type, the thickness and the construction environment of concrete, so that the optimal vibrating effect is achieved.
本发明公开了一种混凝土施工振捣装置及施工方法,承载架的内腔左右两侧壁均开设有竖槽,承载架的顶部前端从左到右均匀固定设置有若干电动机,每个电动机的底部均固定设置有胶管,每个胶管的底部均贯穿承载架的底部且固定设置有振捣棒,承载架的顶部后端固定设置有防护罩,本发明涉及混凝土工程施工技术领域。该混凝土施工振捣装置及施工方法,通过竖槽、间距调节机构、振捣棒以及丝杆之间的相互配合,提前操作间距调节机构,能使相邻振捣棒之间的距离等间距变化,从而实现对相邻振捣棒之间间距的灵活、快速调节,使施工人员能够根据混凝土的种类、厚度和施工环境,迅速调整振捣棒的布局,以达到最佳的振捣效果。
Concrete construction vibrating device and construction method
The concrete construction vibrating device is characterized in that vertical grooves are formed in the left side wall and the right side wall of an inner cavity of a bearing frame, a plurality of motors are evenly and fixedly arranged at the front end of the top of the bearing frame from left to right, and a rubber pipe is fixedly arranged at the bottom of each motor; and the bottom of each rubber pipe penetrates through the bottom of the bearing frame and is fixedly provided with a vibrating rod, and a protective cover is fixedly arranged at the rear end of the top of the bearing frame. According to the concrete construction vibrating device and the construction method, through mutual cooperation of the vertical grooves, the distance adjusting mechanisms, the vibrating rods and the lead screws, the distance adjusting mechanisms are operated in advance, the distance between the adjacent vibrating rods can be changed at equal intervals, and therefore the distance between the adjacent vibrating rods can be flexibly and rapidly adjusted; and a constructor can quickly adjust the layout of the vibrating rod according to the type, the thickness and the construction environment of concrete, so that the optimal vibrating effect is achieved.
本发明公开了一种混凝土施工振捣装置及施工方法,承载架的内腔左右两侧壁均开设有竖槽,承载架的顶部前端从左到右均匀固定设置有若干电动机,每个电动机的底部均固定设置有胶管,每个胶管的底部均贯穿承载架的底部且固定设置有振捣棒,承载架的顶部后端固定设置有防护罩,本发明涉及混凝土工程施工技术领域。该混凝土施工振捣装置及施工方法,通过竖槽、间距调节机构、振捣棒以及丝杆之间的相互配合,提前操作间距调节机构,能使相邻振捣棒之间的距离等间距变化,从而实现对相邻振捣棒之间间距的灵活、快速调节,使施工人员能够根据混凝土的种类、厚度和施工环境,迅速调整振捣棒的布局,以达到最佳的振捣效果。
Concrete construction vibrating device and construction method
一种混凝土施工振捣装置及施工方法
ZUO ZHIJUN (author) / LI YUFEI (author) / LI YUJIE (author) / PAN JINGYU (author) / LI WEI (author)
2024-10-15
Patent
Electronic Resource
Chinese
Concrete vibrating device and construction method thereof
European Patent Office | 2020
|