A platform for research: civil engineering, architecture and urbanism
Prefabricated elevator shaft structure and construction method thereof
The invention discloses a prefabricated elevator shaft structure and a construction method thereof, the prefabricated elevator shaft structure comprises a prefabricated base and a square steel tube hoistway erected on the prefabricated base, a top beam plate is packaged at the top of the square steel tube hoistway, and an air outlet is formed in the lower end of the top beam plate; one side of the square steel tube hoistway is connected with a wall body on the side surface of the building body and is fixed through a connecting clamping plate; the outer side of the square steel tube hoistway is packaged by energy-saving glass; an opening communicated with the square steel tube hoistway is formed between every two adjacent floors. The prefabricated base can be tightly connected with the foundation cushion layer, and the integrity of the foundation bottom plate and a shear wall of the elevator shaft foundation part is ensured; meanwhile, the square steel tube hoistway is attached to the wall, the stability degree of the hoistway can be increased, the scaffold is erected in the hoistway, the scaffold body is safe and convenient to operate, the site environment and residents are not affected, and the overall rigidity of the scaffold body is enhanced.
本申请公开了一种预制型电梯井结构及其施工方法,包括:预制底座以及架设在预制底座上的方钢管井道,方钢管井道顶部封装有顶梁板,顶梁板下端设有出气口;方钢管井道一侧与楼体侧面的墙体连接并通过连接卡板固定;方钢管井道外侧通过节能玻璃封装;其中,相邻的楼层之间设有与方钢管井道连通的开口。本申请的预制底座能与基础垫层紧密接合,确保基础底板与电梯井道基础部分剪力墙整体性;同时方钢管井道与墙体贴合设置可以增加井道的稳固程度,并且脚手架搭设在井道内部,架体安全,操作方便,不对现场环境和居民产生影响,架体的整体刚度增强。
Prefabricated elevator shaft structure and construction method thereof
The invention discloses a prefabricated elevator shaft structure and a construction method thereof, the prefabricated elevator shaft structure comprises a prefabricated base and a square steel tube hoistway erected on the prefabricated base, a top beam plate is packaged at the top of the square steel tube hoistway, and an air outlet is formed in the lower end of the top beam plate; one side of the square steel tube hoistway is connected with a wall body on the side surface of the building body and is fixed through a connecting clamping plate; the outer side of the square steel tube hoistway is packaged by energy-saving glass; an opening communicated with the square steel tube hoistway is formed between every two adjacent floors. The prefabricated base can be tightly connected with the foundation cushion layer, and the integrity of the foundation bottom plate and a shear wall of the elevator shaft foundation part is ensured; meanwhile, the square steel tube hoistway is attached to the wall, the stability degree of the hoistway can be increased, the scaffold is erected in the hoistway, the scaffold body is safe and convenient to operate, the site environment and residents are not affected, and the overall rigidity of the scaffold body is enhanced.
本申请公开了一种预制型电梯井结构及其施工方法,包括:预制底座以及架设在预制底座上的方钢管井道,方钢管井道顶部封装有顶梁板,顶梁板下端设有出气口;方钢管井道一侧与楼体侧面的墙体连接并通过连接卡板固定;方钢管井道外侧通过节能玻璃封装;其中,相邻的楼层之间设有与方钢管井道连通的开口。本申请的预制底座能与基础垫层紧密接合,确保基础底板与电梯井道基础部分剪力墙整体性;同时方钢管井道与墙体贴合设置可以增加井道的稳固程度,并且脚手架搭设在井道内部,架体安全,操作方便,不对现场环境和居民产生影响,架体的整体刚度增强。
Prefabricated elevator shaft structure and construction method thereof
一种预制型电梯井结构及其施工方法
HUANG SHUITAO (author) / YAN JINZHOU (author) / HUANG DONGJING (author) / LU YONGBO (author) / ZHOU FENG (author) / YIN LIANG (author) / HUANG DONGWEI (author) / TANG SAILONG (author)
2024-10-15
Patent
Electronic Resource
Chinese
Elevator shaft prefabricated frame and elevator shaft construction method
European Patent Office | 2022
|European Patent Office | 2021
|Prefabricated laminated elevator shaft and mounting method thereof
European Patent Office | 2020
|