The invention discloses a tailing dam seepage drainage system and belongs to the technical field of engineering seepage drainage, the tailing dam seepage drainage system comprises a first seepage drainage part and a second seepage drainage part, the first seepage drainage part is arranged along the beach face of a tailing dam in the direction parallel to the axis of the dam, the second seepage drainage part is communicated with the first seepage drainage part, and the second seepage drainage part and the first seepage drainage part are arranged at an angle; the second drainage and seepage part comprises a first drainage and seepage unit and a second drainage and seepage unit, and the first drainage and seepage unit is located on one side of the first drainage and seepage part and obliquely extends downwards from the connecting end of the first drainage and seepage unit and the first drainage and seepage part; the second drainage unit is located on the other side of the first drainage part and obliquely extends upwards from the connecting end of the second drainage unit and the first drainage part. Through combined use of the first seepage drainage part, the first seepage drainage unit and the second seepage drainage unit, the effects of double vertical seepage drainage and double horizontal seepage drainage can be achieved, the seepage drainage effect is greatly improved, the applicability is wider, the seepage line reducing effect is better, the durability is better, and the stability of the dam body is greatly improved.
本发明公开了一种尾矿坝排渗系统,属于工程排渗技术领域,包括第一排渗部和第二排渗部,第一排渗部沿尾矿坝的滩面平行坝轴线方向设置,第二排渗部与第一排渗部相连通,第二排渗部与第一排渗部呈角度设置,第二排渗部包括第一排渗单元和第二排渗单元,第一排渗单元位于第一排渗部的一侧且从第一排渗单元与第一排渗部的连接端向下倾斜延伸,第二排渗单元位于第一排渗部的另一侧且从第二排渗单元与第一排渗部的连接端向上倾斜延伸。本发明通过第一排渗部、第一排渗单元和第二排渗单元联合使用能够达到双重竖直排渗和双重水平排渗的效果,大大提高了排渗效果,适用性更广,降低浸润线效果更佳,持久性更好,大大提高了坝体稳定性。
The invention discloses a tailing dam seepage drainage system and belongs to the technical field of engineering seepage drainage, the tailing dam seepage drainage system comprises a first seepage drainage part and a second seepage drainage part, the first seepage drainage part is arranged along the beach face of a tailing dam in the direction parallel to the axis of the dam, the second seepage drainage part is communicated with the first seepage drainage part, and the second seepage drainage part and the first seepage drainage part are arranged at an angle; the second drainage and seepage part comprises a first drainage and seepage unit and a second drainage and seepage unit, and the first drainage and seepage unit is located on one side of the first drainage and seepage part and obliquely extends downwards from the connecting end of the first drainage and seepage unit and the first drainage and seepage part; the second drainage unit is located on the other side of the first drainage part and obliquely extends upwards from the connecting end of the second drainage unit and the first drainage part. Through combined use of the first seepage drainage part, the first seepage drainage unit and the second seepage drainage unit, the effects of double vertical seepage drainage and double horizontal seepage drainage can be achieved, the seepage drainage effect is greatly improved, the applicability is wider, the seepage line reducing effect is better, the durability is better, and the stability of the dam body is greatly improved.
本发明公开了一种尾矿坝排渗系统,属于工程排渗技术领域,包括第一排渗部和第二排渗部,第一排渗部沿尾矿坝的滩面平行坝轴线方向设置,第二排渗部与第一排渗部相连通,第二排渗部与第一排渗部呈角度设置,第二排渗部包括第一排渗单元和第二排渗单元,第一排渗单元位于第一排渗部的一侧且从第一排渗单元与第一排渗部的连接端向下倾斜延伸,第二排渗单元位于第一排渗部的另一侧且从第二排渗单元与第一排渗部的连接端向上倾斜延伸。本发明通过第一排渗部、第一排渗单元和第二排渗单元联合使用能够达到双重竖直排渗和双重水平排渗的效果,大大提高了排渗效果,适用性更广,降低浸润线效果更佳,持久性更好,大大提高了坝体稳定性。
Tailing dam seepage drainage system
一种尾矿坝排渗系统
QI XIAODAN (author)
2024-10-22
Patent
Electronic Resource
Chinese
Centralized seepage drainage device for tailing pond and seepage drainage method thereof
European Patent Office | 2021
|