A platform for research: civil engineering, architecture and urbanism
Concrete pouring system and method for fabricated steel structure building
The invention discloses a concrete pouring system and method for an assembly type steel structure building, and relates to the technical field of constructions.The concrete pouring system for the assembly type steel structure building comprises a steel structure building, a driving device, a pouring assembly, a bailey truss and a supporting piece; the steel structure building is fixed with the supporting piece; the pouring assembly is in sliding connection with the top of the bailey truss. The bailey truss is in sliding connection with the supporting piece; the driving device is fixed with the bailey truss and is in sliding connection with the supporting piece; the pouring assembly comprises a concrete pump truck, a ground pump, a hose and a material distributing machine. The concrete pump truck injects concrete into an input port of the ground pump; and an output port of the ground pump is communicated with the distributing machine through a hose. The method has the beneficial effect that the concrete pouring efficiency and the construction efficiency can be improved.
本发明公开了一种装配式钢结构建筑的混凝土浇筑系统及方法,涉及建筑技术领域,所述装配式钢结构建筑的混凝土浇筑系统包括钢结构建筑、驱动装置、浇筑组件、贝雷架以及支撑件;所述钢结构建筑与支撑件相固定;所述浇筑组件与贝雷架的顶部滑动连接;所述贝雷架与支撑件滑动连接;所述驱动装置与贝雷架相固定,且与支撑件滑动连接;所述浇筑组件包括混凝土泵车、地泵、软管以及布料机;所述混凝土泵车向地泵的输入口注入混凝土;地泵的输出口通过软管与布料机连通。本发明的有益效果:能够提高混凝土浇筑效率和施工效率。
Concrete pouring system and method for fabricated steel structure building
The invention discloses a concrete pouring system and method for an assembly type steel structure building, and relates to the technical field of constructions.The concrete pouring system for the assembly type steel structure building comprises a steel structure building, a driving device, a pouring assembly, a bailey truss and a supporting piece; the steel structure building is fixed with the supporting piece; the pouring assembly is in sliding connection with the top of the bailey truss. The bailey truss is in sliding connection with the supporting piece; the driving device is fixed with the bailey truss and is in sliding connection with the supporting piece; the pouring assembly comprises a concrete pump truck, a ground pump, a hose and a material distributing machine. The concrete pump truck injects concrete into an input port of the ground pump; and an output port of the ground pump is communicated with the distributing machine through a hose. The method has the beneficial effect that the concrete pouring efficiency and the construction efficiency can be improved.
本发明公开了一种装配式钢结构建筑的混凝土浇筑系统及方法,涉及建筑技术领域,所述装配式钢结构建筑的混凝土浇筑系统包括钢结构建筑、驱动装置、浇筑组件、贝雷架以及支撑件;所述钢结构建筑与支撑件相固定;所述浇筑组件与贝雷架的顶部滑动连接;所述贝雷架与支撑件滑动连接;所述驱动装置与贝雷架相固定,且与支撑件滑动连接;所述浇筑组件包括混凝土泵车、地泵、软管以及布料机;所述混凝土泵车向地泵的输入口注入混凝土;地泵的输出口通过软管与布料机连通。本发明的有益效果:能够提高混凝土浇筑效率和施工效率。
Concrete pouring system and method for fabricated steel structure building
一种装配式钢结构建筑的混凝土浇筑系统及方法
ZHANG XIAOMING (author) / LIU SHU (author) / ZHOU YANPING (author) / ZENG YI (author) / YAO PENGPENG (author) / ZHOU XIAO (author) / LIU JIAHAO (author) / SUN LIN (author)
2024-10-22
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Fabricated steel structure pouring-free concrete building structure
European Patent Office | 2021
|Fabricated steel structure pouring-free concrete building structure
European Patent Office | 2023
|Concrete pouring construction method for fabricated steel structure building foundation
European Patent Office | 2024
|FABRICATED STEEL STRUCTURE POURING-FREE CONCRETE BUILDING STRUCTURE FOR CIVIL ENGINEERING
European Patent Office | 2024
|