A platform for research: civil engineering, architecture and urbanism
Movable gas film awning for heat preservation in foundation pit construction in winter and assembling method of movable gas film awning
The invention discloses a movable gas film awning for foundation pit construction heat preservation in winter and an assembling method thereof, and belongs to the field of heat preservation awns.The movable gas film awning comprises guide rail assemblies arranged on the ground on the two sides of a foundation pit, an awning assembly slidably arranged at the top ends of the guide rail assemblies and a heat supply assembly communicating with the awning assembly, and the awning assembly is of a three-layer heat preservation structure; the awning assembly comprises a drainage film, an arch-shaped air rib type film and a first heat energy reflecting surface which are sequentially arranged from outside to inside, the bottom end of the arch-shaped air rib type film is slidably arranged on the sliding rail assembly through a base and rolling wheels in sequence, the outer circumferential side of the arch-shaped air rib type film is wrapped with the drainage film, and the bottom end of the drainage film extends in the direction away from the arch-shaped air rib type film; and the base is fixed on the ground through rivets. The movable gas film awning for heat preservation in winter foundation pit construction and the assembling method thereof have the advantages of being convenient to mount and dismount, high in heat preservation performance, capable of automatically removing snow, movable, reusable, low in cost and the like, and therefore the foundation pit construction in winter is facilitated.
本发明公开了一种冬季基坑施工保温用可移动式气膜罩棚及其组装方法,属于保温罩棚领域,包括布置于基坑两侧地面上的导轨组件、滑动设置于导轨组件顶端的罩棚组件以及与罩棚组件连通的供热组件,罩棚组件为三层保温结构;罩棚组件包括由外到内依次设置的排水膜、拱形气肋式膜和第一热能反射面,拱形气肋式膜的底端依次经底座和滚轮滑动设置于滑轨组件,拱形气肋式膜的外圆周侧包覆有排水膜,排水膜的底端向远离拱形气肋式膜的方向延伸,并经铆钉固定于地面上。本发明采用上述冬季基坑施工保温用可移动式气膜罩棚及其组装方法,具有安装拆卸便捷、保温性高、可自动除雪、可移动、可重复利用、成本低等优势,从而便于冬季的基坑施工。
Movable gas film awning for heat preservation in foundation pit construction in winter and assembling method of movable gas film awning
The invention discloses a movable gas film awning for foundation pit construction heat preservation in winter and an assembling method thereof, and belongs to the field of heat preservation awns.The movable gas film awning comprises guide rail assemblies arranged on the ground on the two sides of a foundation pit, an awning assembly slidably arranged at the top ends of the guide rail assemblies and a heat supply assembly communicating with the awning assembly, and the awning assembly is of a three-layer heat preservation structure; the awning assembly comprises a drainage film, an arch-shaped air rib type film and a first heat energy reflecting surface which are sequentially arranged from outside to inside, the bottom end of the arch-shaped air rib type film is slidably arranged on the sliding rail assembly through a base and rolling wheels in sequence, the outer circumferential side of the arch-shaped air rib type film is wrapped with the drainage film, and the bottom end of the drainage film extends in the direction away from the arch-shaped air rib type film; and the base is fixed on the ground through rivets. The movable gas film awning for heat preservation in winter foundation pit construction and the assembling method thereof have the advantages of being convenient to mount and dismount, high in heat preservation performance, capable of automatically removing snow, movable, reusable, low in cost and the like, and therefore the foundation pit construction in winter is facilitated.
本发明公开了一种冬季基坑施工保温用可移动式气膜罩棚及其组装方法,属于保温罩棚领域,包括布置于基坑两侧地面上的导轨组件、滑动设置于导轨组件顶端的罩棚组件以及与罩棚组件连通的供热组件,罩棚组件为三层保温结构;罩棚组件包括由外到内依次设置的排水膜、拱形气肋式膜和第一热能反射面,拱形气肋式膜的底端依次经底座和滚轮滑动设置于滑轨组件,拱形气肋式膜的外圆周侧包覆有排水膜,排水膜的底端向远离拱形气肋式膜的方向延伸,并经铆钉固定于地面上。本发明采用上述冬季基坑施工保温用可移动式气膜罩棚及其组装方法,具有安装拆卸便捷、保温性高、可自动除雪、可移动、可重复利用、成本低等优势,从而便于冬季的基坑施工。
Movable gas film awning for heat preservation in foundation pit construction in winter and assembling method of movable gas film awning
一种冬季基坑施工保温用可移动式气膜罩棚及其组装方法
CHEN ZHAOQING (author) / WANG SHENGLE (author) / SONG DONGRUI (author) / ZHAO JUNBIN (author) / SU NING (author) / ZENG CONG (author)
2024-10-25
Patent
Electronic Resource
Chinese
PERFORMANCE OF MOVABLE AWNING MEMBRANES
TIBKAT | 2018
|AWNING FIXATION, AWNING ACCESSORY AND AWNING ARRANGEMENTS
European Patent Office | 2024
|