A platform for research: civil engineering, architecture and urbanism
Marine wind power platform ship berthing device
The invention provides an ocean wind power platform ship berthing device, the ocean wind power platform comprises a main guide pipe frame leg, the main guide pipe frame leg comprises a frame leg connecting piece, a supporting guide column, a first buffer assembly, a lifting assembly and a second buffer assembly, and the first buffer assembly, the lifting buffer assembly and the second buffer assembly are arranged; when the first buffer assembly provides collision prevention of a part of height intervals, the lifting device is connected with the second buffer assembly, and the second buffer assembly achieves lifting to be matched with tide so as to adapt to the buffer height of the ship body. And the supporting guide columns are arranged to be matched with the structure of the first buffering assembly, accessory equipment is added in the height direction and near the area range where the first buffering assembly is located, fixing of the ship body, embarkation of operators and equipment maintenance treatment are facilitated, and the function expansion capacity of the ship berthing device of the offshore wind power platform is improved.
本发明提供了一种海洋风电平台船舶靠泊装置,海洋风电平台包括主导管架腿,包括架腿连接件、支撑导柱、第一缓冲总成、升降总成和第二缓冲总成,通过设置第一缓冲总成、升降缓冲总成和第二缓冲总成,在第一缓冲总成提供一部分高度区间的防碰的同时,依靠升降装置连接第二缓冲总成,第二缓冲总成实现升降以配合潮汐,进行船体缓冲高度的适配。并且设置支撑导柱,得以配合第一缓冲总成的结构,在高度方向上以及第一缓冲总成所在区域范围附近,进行附属设备的添加,便于船体进行固定、操作人员的登乘及设备维护处理,提高海上风电平台船舶靠泊装置的功能拓展能力。
Marine wind power platform ship berthing device
The invention provides an ocean wind power platform ship berthing device, the ocean wind power platform comprises a main guide pipe frame leg, the main guide pipe frame leg comprises a frame leg connecting piece, a supporting guide column, a first buffer assembly, a lifting assembly and a second buffer assembly, and the first buffer assembly, the lifting buffer assembly and the second buffer assembly are arranged; when the first buffer assembly provides collision prevention of a part of height intervals, the lifting device is connected with the second buffer assembly, and the second buffer assembly achieves lifting to be matched with tide so as to adapt to the buffer height of the ship body. And the supporting guide columns are arranged to be matched with the structure of the first buffering assembly, accessory equipment is added in the height direction and near the area range where the first buffering assembly is located, fixing of the ship body, embarkation of operators and equipment maintenance treatment are facilitated, and the function expansion capacity of the ship berthing device of the offshore wind power platform is improved.
本发明提供了一种海洋风电平台船舶靠泊装置,海洋风电平台包括主导管架腿,包括架腿连接件、支撑导柱、第一缓冲总成、升降总成和第二缓冲总成,通过设置第一缓冲总成、升降缓冲总成和第二缓冲总成,在第一缓冲总成提供一部分高度区间的防碰的同时,依靠升降装置连接第二缓冲总成,第二缓冲总成实现升降以配合潮汐,进行船体缓冲高度的适配。并且设置支撑导柱,得以配合第一缓冲总成的结构,在高度方向上以及第一缓冲总成所在区域范围附近,进行附属设备的添加,便于船体进行固定、操作人员的登乘及设备维护处理,提高海上风电平台船舶靠泊装置的功能拓展能力。
Marine wind power platform ship berthing device
一种海洋风电平台船舶靠泊装置
WANG ZHENXIANG (author) / CHEN BIJIN (author) / WANG YONGHUI (author) / CHEN SHENGQIANG (author) / CHEN JIANHUI (author)
2024-10-29
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Floating wind power platform wharf berthing isolation device
European Patent Office | 2023
|