A platform for research: civil engineering, architecture and urbanism
Integrated building climbing frame
The invention discloses an integrated building climbing frame which comprises a supporting unit fixedly installed at the bottom and a main frame body fixedly laid on the supporting unit. A supporting unit in the climbing frame comprises a cylindrical vertical rod penetrating into the ground to be fixedly installed, a large transverse rod transversely fixed to the cylindrical vertical rod and a small transverse rod vertically fixed to the cylindrical vertical rod, and a diagonal bridging mechanism is fixedly installed on the front face of the cylindrical vertical rod. The main frame body comprises two walkway plates transversely laid on the tops of the supporting units and telescopic vertical rods fixedly connected to the walkway plates through bolts, the telescopic vertical rods can automatically extend upwards, and the procedure that the vertical rods are frequently installed upwards is simplified. According to the integrated building climbing frame, the motor is connected with the screw transmission system to control the stretching and retracting process of the vertical rod, through the design of the integrated detachable walkway plate, the assembling procedures are greatly reduced during assembling, climbing is conducted along with the structure construction progress, repeated building is avoided, and the construction period is effectively shortened.
本发明公开了一种集成式建筑爬架包括固定安装在底部的支撑单元和固定铺设在支撑单元上的主架体,所述爬架中的支撑单元包括深入地面固定安装的圆柱形立杆和横向固定在圆柱形立杆上的大横杆以及竖向固定在圆柱形立杆上的小横杆,圆柱形立杆正面固定安装剪刀撑机构,所述主架体包括两块横向铺设在支撑单元顶部的走道板和通过螺栓固定连接在走道板上的可伸缩立杆,所述可伸缩立杆可自动向上延伸,简化了频繁进行立杆向上安装的程序。本发明公开的一种集成式建筑爬架通过电机连接螺杆传动系统来操控立杆的伸缩过程以及通过一体式可拆卸式走道板的设计在进行组装时大大减少的组装工序,并且随结构施工进度进行爬升,避免了重复搭建,有效缩短了工期。
Integrated building climbing frame
The invention discloses an integrated building climbing frame which comprises a supporting unit fixedly installed at the bottom and a main frame body fixedly laid on the supporting unit. A supporting unit in the climbing frame comprises a cylindrical vertical rod penetrating into the ground to be fixedly installed, a large transverse rod transversely fixed to the cylindrical vertical rod and a small transverse rod vertically fixed to the cylindrical vertical rod, and a diagonal bridging mechanism is fixedly installed on the front face of the cylindrical vertical rod. The main frame body comprises two walkway plates transversely laid on the tops of the supporting units and telescopic vertical rods fixedly connected to the walkway plates through bolts, the telescopic vertical rods can automatically extend upwards, and the procedure that the vertical rods are frequently installed upwards is simplified. According to the integrated building climbing frame, the motor is connected with the screw transmission system to control the stretching and retracting process of the vertical rod, through the design of the integrated detachable walkway plate, the assembling procedures are greatly reduced during assembling, climbing is conducted along with the structure construction progress, repeated building is avoided, and the construction period is effectively shortened.
本发明公开了一种集成式建筑爬架包括固定安装在底部的支撑单元和固定铺设在支撑单元上的主架体,所述爬架中的支撑单元包括深入地面固定安装的圆柱形立杆和横向固定在圆柱形立杆上的大横杆以及竖向固定在圆柱形立杆上的小横杆,圆柱形立杆正面固定安装剪刀撑机构,所述主架体包括两块横向铺设在支撑单元顶部的走道板和通过螺栓固定连接在走道板上的可伸缩立杆,所述可伸缩立杆可自动向上延伸,简化了频繁进行立杆向上安装的程序。本发明公开的一种集成式建筑爬架通过电机连接螺杆传动系统来操控立杆的伸缩过程以及通过一体式可拆卸式走道板的设计在进行组装时大大减少的组装工序,并且随结构施工进度进行爬升,避免了重复搭建,有效缩短了工期。
Integrated building climbing frame
一种集成式建筑爬架
SONG SHIFENG (author) / HE GUANGZHANG (author) / CHAI YONGCUN (author) / FENG YANG (author) / ZHANG WEIDONG (author) / LI MINGLI (author)
2024-10-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Climbing frame fixing structure and building construction climbing frame
European Patent Office | 2023
|