Shallow basement and deep underground garage combined construction method
The invention belongs to the field of urban renewal and underground space development, and relates to a shallow basement and deep underground garage combined construction method. The method comprises the steps that firstly, a foundation pit first horizontal supporting structure is rigidly connected with a foundation pit vertical supporting structure and a foundation pit enclosure body; the deep underground garage is located in the shallow basement; and a construction platform is arranged on the first horizontal supporting structure of the foundation pit. Secondly, all the horizontal supporting structures in the shallow basement are constructed successively till the foundation of the shallow basement is excavated; and the deep underground garage is constructed below the elevation of the shallow basement base synchronously. Thirdly, the horizontal supporting structure is dismantled, and a shallow basement body structure is constructed upwards; a construction hole is reserved in the shallow basement body structure, and the deep underground garage continues to conduct downward construction. And fourthly, overall construction of the overall structure of the deep underground garage and the main structure of the shallow basement is completed. In a newly-built underground space project, the deep underground garage does not need additional site selection and is arranged in an existing underground garage, and related supporting facilities can be shared.
本发明属于城市更新和地下空间开发领域的一种浅层地下室与深层地下车库结合施工的方法。步骤一:基坑首道水平支撑结构与基坑竖向支承结构和基坑围护体刚性连接;深层地下车库位于浅层地下室内部;在基坑首道水平支撑结构上设置施工平台。步骤二:陆续施工浅层地下室内的各道水平支撑结构,直至开挖至浅层地下室基底;深层地下车库同步向浅层地下室基底的标高以下施工。步骤三:拆除水平支撑结构,向上施工浅层地下室主体结构;浅层地下室主体结构内留施工洞,深层地下车库继续向下施工。步骤四:完成深层地下车库的整体结构和浅层地下室主体结构的整体施工。其可以实现在新建地下空间工程中,深层地下车库无需另外选址,设置在现有地下车库内部,相关配套设施可以共用。
Shallow basement and deep underground garage combined construction method
The invention belongs to the field of urban renewal and underground space development, and relates to a shallow basement and deep underground garage combined construction method. The method comprises the steps that firstly, a foundation pit first horizontal supporting structure is rigidly connected with a foundation pit vertical supporting structure and a foundation pit enclosure body; the deep underground garage is located in the shallow basement; and a construction platform is arranged on the first horizontal supporting structure of the foundation pit. Secondly, all the horizontal supporting structures in the shallow basement are constructed successively till the foundation of the shallow basement is excavated; and the deep underground garage is constructed below the elevation of the shallow basement base synchronously. Thirdly, the horizontal supporting structure is dismantled, and a shallow basement body structure is constructed upwards; a construction hole is reserved in the shallow basement body structure, and the deep underground garage continues to conduct downward construction. And fourthly, overall construction of the overall structure of the deep underground garage and the main structure of the shallow basement is completed. In a newly-built underground space project, the deep underground garage does not need additional site selection and is arranged in an existing underground garage, and related supporting facilities can be shared.
本发明属于城市更新和地下空间开发领域的一种浅层地下室与深层地下车库结合施工的方法。步骤一:基坑首道水平支撑结构与基坑竖向支承结构和基坑围护体刚性连接;深层地下车库位于浅层地下室内部;在基坑首道水平支撑结构上设置施工平台。步骤二:陆续施工浅层地下室内的各道水平支撑结构,直至开挖至浅层地下室基底;深层地下车库同步向浅层地下室基底的标高以下施工。步骤三:拆除水平支撑结构,向上施工浅层地下室主体结构;浅层地下室主体结构内留施工洞,深层地下车库继续向下施工。步骤四:完成深层地下车库的整体结构和浅层地下室主体结构的整体施工。其可以实现在新建地下空间工程中,深层地下车库无需另外选址,设置在现有地下车库内部,相关配套设施可以共用。
Shallow basement and deep underground garage combined construction method
一种浅层地下室与深层地下车库结合施工的方法
WANG WEIDONG (author) / SHEN JIAN (author) / XUN WEI (author) / WANG HUISHENG (author) / YU ZHIRUI (author) / HU YUN (author) / JIANG TAO (author) / LOU ZHIJUN (author) / MIN YOUNG-EUN (author) / GU HUI (author)
2024-11-01
Patent
Electronic Resource
Chinese
Underground parking garage and urban tunnel combined construction structure
European Patent Office | 2020
|Switchboard water invasion prevention protection assembly for basement or underground garage
European Patent Office | 2021
|