A platform for research: civil engineering, architecture and urbanism
GRC curtain wall assembly structure and GRC curtain wall assembly method
The invention discloses a GRC curtain wall assembly structure and a GRC curtain wall assembly method.The GRC curtain wall assembly structure comprises a wall body, a framework assembly is fixedly installed on the surface of the wall body, a curtain wall plate is arranged on the side, away from the wall body, of the framework assembly, and the framework assembly comprises a first cross beam, a longitudinal beam and a second cross beam which are sequentially connected in a stacked mode from inside to outside; at least two hooks are arranged on the side, close to the framework assembly, of the curtain wall plate, hanging grooves are distributed in the top of the second cross beam in an array mode and correspond to the hooks in a one-to-one mode, and the hooks can be inserted into the hanging grooves from top to bottom. The GRC curtain wall has the advantages that the curtain wall plates can be hung only by placing the hooks in the hanging grooves, operation is quite convenient, the curtain wall plates are clamped in the hanging grooves, gaps between the adjacent curtain wall plates can be kept consistent, and therefore the overall attractiveness of the GRC curtain wall is guaranteed.
本发明公开了GRC幕墙装配结构及GRC幕墙装配方法,包括墙体,墙体表面固定安装有骨架组件,骨架组件远离墙体的一侧设有幕墙板,骨架组件包括由内至外依次堆叠连接的第一横梁、纵梁以及第二横梁,幕墙板靠近骨架组件的一侧设有至少两个挂钩,第二横梁顶部阵列分布有挂槽,挂槽与挂钩一一对应,并且挂钩能够自上而下的插入挂槽内。本发明的有益效果是:仅需将挂钩置于挂槽内,即可实现幕墙板的挂装,操作十分方便,且由于幕墙板卡装在挂槽内,相邻幕墙板之间的间隙能够保持一致,进而保证了GRC幕墙整体的美观性。
GRC curtain wall assembly structure and GRC curtain wall assembly method
The invention discloses a GRC curtain wall assembly structure and a GRC curtain wall assembly method.The GRC curtain wall assembly structure comprises a wall body, a framework assembly is fixedly installed on the surface of the wall body, a curtain wall plate is arranged on the side, away from the wall body, of the framework assembly, and the framework assembly comprises a first cross beam, a longitudinal beam and a second cross beam which are sequentially connected in a stacked mode from inside to outside; at least two hooks are arranged on the side, close to the framework assembly, of the curtain wall plate, hanging grooves are distributed in the top of the second cross beam in an array mode and correspond to the hooks in a one-to-one mode, and the hooks can be inserted into the hanging grooves from top to bottom. The GRC curtain wall has the advantages that the curtain wall plates can be hung only by placing the hooks in the hanging grooves, operation is quite convenient, the curtain wall plates are clamped in the hanging grooves, gaps between the adjacent curtain wall plates can be kept consistent, and therefore the overall attractiveness of the GRC curtain wall is guaranteed.
本发明公开了GRC幕墙装配结构及GRC幕墙装配方法,包括墙体,墙体表面固定安装有骨架组件,骨架组件远离墙体的一侧设有幕墙板,骨架组件包括由内至外依次堆叠连接的第一横梁、纵梁以及第二横梁,幕墙板靠近骨架组件的一侧设有至少两个挂钩,第二横梁顶部阵列分布有挂槽,挂槽与挂钩一一对应,并且挂钩能够自上而下的插入挂槽内。本发明的有益效果是:仅需将挂钩置于挂槽内,即可实现幕墙板的挂装,操作十分方便,且由于幕墙板卡装在挂槽内,相邻幕墙板之间的间隙能够保持一致,进而保证了GRC幕墙整体的美观性。
GRC curtain wall assembly structure and GRC curtain wall assembly method
GRC幕墙装配结构及GRC幕墙装配方法
ZHANG ZHIYAN (author) / CHEN QIAN (author) / YANG RENBING (author) / MI WEI (author) / WANG MIN (author) / SHU ZHIHUA (author) / QIAN XINYI (author) / GUO JUNYI (author) / SHEN BAOGUO (author) / WEI ZHENG (author)
2024-11-01
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Double-layer curtain wall and curtain wall structure assembly
European Patent Office | 2024
|Curtain wall supporting piece and curtain wall structure assembly
European Patent Office | 2024
|