Non-standard flower-riding frame beam type hanging basket system and construction method thereof
According to the non-standard riding flower frame beam type hanging basket system and the construction method thereof, the self loads of a roof parapet wall and a flower frame beam structure are fully utilized, the design of a rear support and a balancing weight of a traditional riding beam hanging basket is omitted, the anti-overturning moment generated by a hanging basket body and operators is provided by a building structure, and the construction cost is reduced. According to the construction method, resource waste and roof space occupation in the hanging basket construction operation period are reduced, the renting and mounting cost of a balancing weight and a rear support and the roof secondary construction cost are saved, roof construction can be synchronously carried out according to construction procedure arrangement, and the quality risks such as leakage and cracking caused by roof procedure post-construction are greatly reduced.
本发明提供了一种非标骑花架梁式吊篮体系及其施工方法,充分利用屋面女儿墙及花架梁结构自身荷载,取消传统骑梁吊篮后支架及配重块的设计,吊篮篮体及作业人员产生的抗倾覆力矩由建筑结构提供,减少了资源浪费以及吊篮施工作业周期中对屋面空间的占用,节约了配重块及后支架租赁及安装费用、屋面二次施工费用,可按施工工序安排同步开展屋面施工,大大降低了屋面工序后置施工造成的渗漏及开裂等质量风险。
Non-standard flower-riding frame beam type hanging basket system and construction method thereof
According to the non-standard riding flower frame beam type hanging basket system and the construction method thereof, the self loads of a roof parapet wall and a flower frame beam structure are fully utilized, the design of a rear support and a balancing weight of a traditional riding beam hanging basket is omitted, the anti-overturning moment generated by a hanging basket body and operators is provided by a building structure, and the construction cost is reduced. According to the construction method, resource waste and roof space occupation in the hanging basket construction operation period are reduced, the renting and mounting cost of a balancing weight and a rear support and the roof secondary construction cost are saved, roof construction can be synchronously carried out according to construction procedure arrangement, and the quality risks such as leakage and cracking caused by roof procedure post-construction are greatly reduced.
本发明提供了一种非标骑花架梁式吊篮体系及其施工方法,充分利用屋面女儿墙及花架梁结构自身荷载,取消传统骑梁吊篮后支架及配重块的设计,吊篮篮体及作业人员产生的抗倾覆力矩由建筑结构提供,减少了资源浪费以及吊篮施工作业周期中对屋面空间的占用,节约了配重块及后支架租赁及安装费用、屋面二次施工费用,可按施工工序安排同步开展屋面施工,大大降低了屋面工序后置施工造成的渗漏及开裂等质量风险。
Non-standard flower-riding frame beam type hanging basket system and construction method thereof
一种非标骑花架梁式吊篮体系及其施工方法
SONG XINZE (author) / BI LEI (author) / ZHANG HAO (author) / CHEN SHIJIAN (author) / QUAN YOUWEI (author) / ZHOU LINLIN (author) / CUI XINXING (author)
2024-11-05
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Clamp type parapet riding beam hanging basket device and parapet hanging basket system
European Patent Office | 2020
|Slope-riding steel beam electric hanging basket and method thereof
European Patent Office | 2022
|Hanging basket fixing frame and construction method thereof
European Patent Office | 2024
|European Patent Office | 2024
|Riding beam hanging basket support structure used for roof and provided with flower stand layer
European Patent Office | 2024
|