Fabricated building structure and mounting method thereof
The embodiment of the invention discloses a fabricated building structure and a mounting method thereof. The fabricated building structure comprises a first prefabricated wall plate, a second prefabricated wall plate, a third prefabricated wall plate and a floor slab body, the first prefabricated wall plate comprises two sets of first wall plate base bodies, the two sets of first wall plate base bodies are connected through first connecting steel bars, and a first cavity is formed between the two sets of first wall plate base bodies; a first positioning hole and a first through groove are formed in the bottom of the first prefabricated wall plate, and first connecting edges are arranged on the two side edges of the first prefabricated wall plate; in the embodiment, the first pouring cavity in the closed state is formed between the first connecting edge of the first prefabricated wall panel and the first assembling edge of the second prefabricated wall panel, and the second pouring cavity in the closed state is formed between the first connecting edge of the first prefabricated wall panel and the second assembling edge of the third prefabricated wall panel, so that the use amount of formworks is reduced; and the positioning holes are of conical structures, so that the positioning steel bars can be automatically extruded and corrected.
本申请实施例公开了一种装配式建筑结构及其安装方法;所述装配式建筑结构包括第一预制墙板、第二预制墙板、第三预制墙板和楼板主体,所述第一预制墙板包括两组第一墙板基体,两组所述第一墙板基体之间通过第一连接钢筋连接,两组所述第一墙板基体之间形成第一空腔,所述第一预制墙板的底部开设有第一定位孔和第一通槽,所述第一预制墙板的两侧边均设置有第一连接边;本实施例中,第一预制墙板的第一连接边与第二预制墙板的第一装配边之间形成闭合状态的第一浇筑腔,第一预制墙板的第一连接边与第三预制墙板的第二装配边之间形成闭合状态的第二浇筑腔,减少了模板使用量,定位孔设置为锥形结构,能够对定位钢筋进行自动挤压矫正。
Fabricated building structure and mounting method thereof
The embodiment of the invention discloses a fabricated building structure and a mounting method thereof. The fabricated building structure comprises a first prefabricated wall plate, a second prefabricated wall plate, a third prefabricated wall plate and a floor slab body, the first prefabricated wall plate comprises two sets of first wall plate base bodies, the two sets of first wall plate base bodies are connected through first connecting steel bars, and a first cavity is formed between the two sets of first wall plate base bodies; a first positioning hole and a first through groove are formed in the bottom of the first prefabricated wall plate, and first connecting edges are arranged on the two side edges of the first prefabricated wall plate; in the embodiment, the first pouring cavity in the closed state is formed between the first connecting edge of the first prefabricated wall panel and the first assembling edge of the second prefabricated wall panel, and the second pouring cavity in the closed state is formed between the first connecting edge of the first prefabricated wall panel and the second assembling edge of the third prefabricated wall panel, so that the use amount of formworks is reduced; and the positioning holes are of conical structures, so that the positioning steel bars can be automatically extruded and corrected.
本申请实施例公开了一种装配式建筑结构及其安装方法;所述装配式建筑结构包括第一预制墙板、第二预制墙板、第三预制墙板和楼板主体,所述第一预制墙板包括两组第一墙板基体,两组所述第一墙板基体之间通过第一连接钢筋连接,两组所述第一墙板基体之间形成第一空腔,所述第一预制墙板的底部开设有第一定位孔和第一通槽,所述第一预制墙板的两侧边均设置有第一连接边;本实施例中,第一预制墙板的第一连接边与第二预制墙板的第一装配边之间形成闭合状态的第一浇筑腔,第一预制墙板的第一连接边与第三预制墙板的第二装配边之间形成闭合状态的第二浇筑腔,减少了模板使用量,定位孔设置为锥形结构,能够对定位钢筋进行自动挤压矫正。
Fabricated building structure and mounting method thereof
一种装配式建筑结构及其安装方法
QIAN TENGFEI (author)
2024-11-08
Patent
Electronic Resource
Chinese
Fabricated building structure and mounting method thereof
European Patent Office | 2022
|Mounting structure of building fabricated wall and mounting method thereof
European Patent Office | 2023
|Fabricated building bottom connecting structure and mounting method thereof
European Patent Office | 2021
|Fabricated building outer wall structure and mounting method thereof
European Patent Office | 2022
|