A platform for research: civil engineering, architecture and urbanism
Construction method of continuous beam rigid frame bridge cantilever pouring linear section
The invention provides a construction method of a continuous beam rigid frame bridge cantilever pouring linear section, and belongs to the field of building construction. According to the technical scheme, the construction method comprises the following steps that S1, beam section construction is conducted; s2, side span closure section construction; and S3, later construction. The method has the beneficial effects that the structure is simple, construction is convenient and fast, the quality of the continuous beam is guaranteed, meanwhile, the continuous beam is convenient and fast in the cantilever linear section pouring process, construction efficiency is high, the period is short, and cost is saved.
本发明提供了一种连续梁刚构桥悬臂浇筑直线段的施工方法,属于建筑施工领域。其技术方案为:施工方法包括以下步骤:S1、梁段施工;S2、边跨合拢段施工;S3、后期施工。本发明的有益效果为:结构简单、施工便捷,保证连续梁质量,同时使得连续梁在悬臂直线段浇筑过程方便快捷,施工效率高,周期短,节约成本。
Construction method of continuous beam rigid frame bridge cantilever pouring linear section
The invention provides a construction method of a continuous beam rigid frame bridge cantilever pouring linear section, and belongs to the field of building construction. According to the technical scheme, the construction method comprises the following steps that S1, beam section construction is conducted; s2, side span closure section construction; and S3, later construction. The method has the beneficial effects that the structure is simple, construction is convenient and fast, the quality of the continuous beam is guaranteed, meanwhile, the continuous beam is convenient and fast in the cantilever linear section pouring process, construction efficiency is high, the period is short, and cost is saved.
本发明提供了一种连续梁刚构桥悬臂浇筑直线段的施工方法,属于建筑施工领域。其技术方案为:施工方法包括以下步骤:S1、梁段施工;S2、边跨合拢段施工;S3、后期施工。本发明的有益效果为:结构简单、施工便捷,保证连续梁质量,同时使得连续梁在悬臂直线段浇筑过程方便快捷,施工效率高,周期短,节约成本。
Construction method of continuous beam rigid frame bridge cantilever pouring linear section
一种连续梁刚构桥悬臂浇筑直线段的施工方法
DONG TIANYUN (author) / LIU HUAQING (author) / HU FENG (author) / ZHOU SHUN (author) / LIU WEI (author) / YANG SHUAI (author) / DUAN JIWEI (author) / WANG MINMIN (author) / JIA LIDE (author) / ZHAO YUZHUO (author)
2024-11-12
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Cantilever pouring bridge construction linear control method
European Patent Office | 2023
|Bridge cantilever pouring linear control construction method
European Patent Office | 2024
|European Patent Office | 2015
|Seismic Research of Continuous Rigid Frame Bridge under Cantilever Construction Method
British Library Conference Proceedings | 2012
|Seismic Research of Continuous Rigid Frame Bridge under Cantilever Construction Method
Trans Tech Publications | 2011
|