A platform for research: civil engineering, architecture and urbanism
Connecting structure used between wall formworks on two sides of shear wall and shear wall
The invention belongs to the technical field of concrete modular buildings, and particularly relates to a connecting structure used between wall formworks on the two sides of a shear wall. The first connecting assembly and the second connecting assembly in the connecting structure are connected through the first steel plate and the second steel plate. Therefore, the connecting structure is convenient and quick to connect and mount and high in precision. The invention further relates to a shear wall. A first horizontal steel bar is arranged in a first prefabricated wall formwork of the shear wall and welded to a first connecting assembly pre-buried in the position of a long wall. A second horizontal steel bar is arranged in the second prefabricated wall formwork and is welded with a second connecting assembly pre-embedded in the long wall position; the first prefabricated wall formwork and the second prefabricated wall formwork are oppositely pulled through a plurality of connecting structures. Therefore, according to the shear wall, longitudinal steel bars are replaced by the first steel plates and the second steel plates, and field binding is not needed. The connecting structure enables the first prefabricated wall formwork, the second prefabricated wall formwork and the cast-in-place concrete to form a stress whole, use of materials is reduced, and the indoor available building area is increased.
本发明属于混凝土模块化建筑技术领域,尤其涉及一种用于剪力墙两侧墙模之间的连接结构。该连接结构中的第一连接组件和第二连接组件通过第一钢板与第二钢板进行连接。由此,该连接结构的连接安装方便快捷且精度高。还涉及一种剪力墙。该剪力墙的第一预制墙模内设置有第一水平钢筋,与预埋在长墙位置的第一连接组件焊接;第二预制墙模内设置有第二水平钢筋,与预埋在长墙位置的第二连接组件焊接;第一预制墙模和第二预制墙模通过若干连接结构实现对拉。由此,该剪力墙将第一钢板和第二钢板替代了纵向钢筋,不需要现场绑扎。连接结构使第一预制墙模、第二预制墙模和现浇混凝土形成一个受力整体,减少材料的使用,增大室内可用建筑面积。
Connecting structure used between wall formworks on two sides of shear wall and shear wall
The invention belongs to the technical field of concrete modular buildings, and particularly relates to a connecting structure used between wall formworks on the two sides of a shear wall. The first connecting assembly and the second connecting assembly in the connecting structure are connected through the first steel plate and the second steel plate. Therefore, the connecting structure is convenient and quick to connect and mount and high in precision. The invention further relates to a shear wall. A first horizontal steel bar is arranged in a first prefabricated wall formwork of the shear wall and welded to a first connecting assembly pre-buried in the position of a long wall. A second horizontal steel bar is arranged in the second prefabricated wall formwork and is welded with a second connecting assembly pre-embedded in the long wall position; the first prefabricated wall formwork and the second prefabricated wall formwork are oppositely pulled through a plurality of connecting structures. Therefore, according to the shear wall, longitudinal steel bars are replaced by the first steel plates and the second steel plates, and field binding is not needed. The connecting structure enables the first prefabricated wall formwork, the second prefabricated wall formwork and the cast-in-place concrete to form a stress whole, use of materials is reduced, and the indoor available building area is increased.
本发明属于混凝土模块化建筑技术领域,尤其涉及一种用于剪力墙两侧墙模之间的连接结构。该连接结构中的第一连接组件和第二连接组件通过第一钢板与第二钢板进行连接。由此,该连接结构的连接安装方便快捷且精度高。还涉及一种剪力墙。该剪力墙的第一预制墙模内设置有第一水平钢筋,与预埋在长墙位置的第一连接组件焊接;第二预制墙模内设置有第二水平钢筋,与预埋在长墙位置的第二连接组件焊接;第一预制墙模和第二预制墙模通过若干连接结构实现对拉。由此,该剪力墙将第一钢板和第二钢板替代了纵向钢筋,不需要现场绑扎。连接结构使第一预制墙模、第二预制墙模和现浇混凝土形成一个受力整体,减少材料的使用,增大室内可用建筑面积。
Connecting structure used between wall formworks on two sides of shear wall and shear wall
一种用于剪力墙两侧墙模之间的连接结构及剪力墙
WANG QIONG (author) / MENG HUI (author) / LU QIAN (author) / ZHANG ZONGJUN (author) / ZHAO BAOJUN (author) / ZHOU BIAO (author) / YAN CHEN (author) / ZHAN HE (author) / LI CHAO (author) / XIAO SHAOHUI (author)
2024-11-12
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Construction method for shear wall formworks on two sides of expansion joint
European Patent Office | 2023
|Construction method for reinforcing shear wall formworks on two sides of deformation joint
European Patent Office | 2024
|Fabricated shear wall connecting mechanism, shear wall and shear wall construction method
European Patent Office | 2021
|Fabricated shear wall connecting mechanism, shear wall and shear wall construction method
European Patent Office | 2021
|