Factory-like assembly method for pipe gallery square cabin cluster
The invention provides a pipe gallery square cabin cluster factory-like assembly method, and belongs to the technical field of seabed data center construction. According to the method, a production line is divided into a pipe gallery prefabrication line and a square cabin butt joint assembly line; steel bars are bound in the steel bar binding area according to the process of the pipe gallery prefabrication assembly line, then the pipe gallery prefabrication assembly line is moved to the pouring area for concrete pouring, and the whole pipe gallery prefabrication assembly line is moved to the butt joint area after pouring is completed; an internal server, a cooling system and a connector are installed in an assembly area of the shelter butt joint assembly line, and after assembly is completed, the assembled shelter is moved to a butt joint area; then the pipe gallery and the square cabin are in butt joint in the butt joint area, and after butt joint is completed, the whole body is moved to the fitting-out area for installation of subsidiary facilities of the pipe gallery square cabin; the method is used for solving the difficulty of assembling and manufacturing of the submarine data center, can effectively solve the problem of manufacturing and assembling of the submarine data center, and has popularization and application values for construction of the submarine data center.
本发明提出了一种管廊方舱集群工厂化装配方法,属于海底数据中心建设技术领域;该方法将生产流水线分为管廊预制流水线和方舱对接装配流水线;根据管廊预制流水线的流程在钢筋绑扎区进行钢筋绑扎,然后移动到浇筑区进行混凝土浇筑,浇筑完成后整体移动到对接区;方舱对接装配流水线在组装区进行内部服务器、冷却系统和接头的安装,组装完成后将组装完成的方舱移运到对接区;随后在对接区将管廊和方舱对接起来,对接完成后整体移动到舾装区进行管廊方舱的附属设施安装;该方法用于解决海底数据中心装配制造的难点难题,能够有效处理实现海底数据中心的制造和装配的问题,对海底数据中心建设有推广应用价值。
Factory-like assembly method for pipe gallery square cabin cluster
The invention provides a pipe gallery square cabin cluster factory-like assembly method, and belongs to the technical field of seabed data center construction. According to the method, a production line is divided into a pipe gallery prefabrication line and a square cabin butt joint assembly line; steel bars are bound in the steel bar binding area according to the process of the pipe gallery prefabrication assembly line, then the pipe gallery prefabrication assembly line is moved to the pouring area for concrete pouring, and the whole pipe gallery prefabrication assembly line is moved to the butt joint area after pouring is completed; an internal server, a cooling system and a connector are installed in an assembly area of the shelter butt joint assembly line, and after assembly is completed, the assembled shelter is moved to a butt joint area; then the pipe gallery and the square cabin are in butt joint in the butt joint area, and after butt joint is completed, the whole body is moved to the fitting-out area for installation of subsidiary facilities of the pipe gallery square cabin; the method is used for solving the difficulty of assembling and manufacturing of the submarine data center, can effectively solve the problem of manufacturing and assembling of the submarine data center, and has popularization and application values for construction of the submarine data center.
本发明提出了一种管廊方舱集群工厂化装配方法,属于海底数据中心建设技术领域;该方法将生产流水线分为管廊预制流水线和方舱对接装配流水线;根据管廊预制流水线的流程在钢筋绑扎区进行钢筋绑扎,然后移动到浇筑区进行混凝土浇筑,浇筑完成后整体移动到对接区;方舱对接装配流水线在组装区进行内部服务器、冷却系统和接头的安装,组装完成后将组装完成的方舱移运到对接区;随后在对接区将管廊和方舱对接起来,对接完成后整体移动到舾装区进行管廊方舱的附属设施安装;该方法用于解决海底数据中心装配制造的难点难题,能够有效处理实现海底数据中心的制造和装配的问题,对海底数据中心建设有推广应用价值。
Factory-like assembly method for pipe gallery square cabin cluster
一种管廊方舱集群工厂化装配方法
YING ZONGQUAN (author) / LIN MEIHONG (author) / ZUO HUANAN (author) / WANG XUEGANG (author) / WEN CHENGYONG (author)
2024-11-15
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Prefabricated single-cabin municipal comprehensive pipe gallery
European Patent Office | 2021
|Drainage structure of comprehensive pipe gallery natural gas cabin and comprehensive pipe gallery
European Patent Office | 2021
|Underground excavation construction method for multi-cabin pipe gallery
European Patent Office | 2022
|Gallery-cabin connection and design method of pipe gallery type seabed data center
European Patent Office | 2024
|