Assembling construction method for large steel structure roof
The invention relates to the field of building structures, and discloses an assembling construction method for a large steel structure roof, which comprises the following steps of: 1, assembling a secondary truss on the ground; 2, floor trusses are spliced; according to the method, the trusses are reasonably partitioned and spliced by adopting a method of splicing and then lifting the sub-trusses, and jig frame elevation control, linear control and welding deformation control are carried out on the small splicing units, so that high-precision and high-efficiency construction of large steel structure roof splicing is realized; and the connection error of various truss members in the splicing process is further reduced, and the mounting quality and precision of the steel structure roof truss are improved.
本发明涉及建筑结构领域,且公开了一种大型钢结构屋盖的拼装施工方法,该方法包括以下步骤:步骤一:进行次桁架地面拼装;步骤二:进行楼面桁架拼装;本发明通过采用分桁架拼装再提升的方法,对桁架进行合理分区拼装,并对小拼单元进行胎架标高控制、线型控制以及焊接变形控制,进而实现了大型钢结构屋盖拼装的高精度、高效率施工,进一步减小了拼装过程中各类桁架构件的连接误差,提高钢结构屋盖桁架的安装质量与精度。
Assembling construction method for large steel structure roof
The invention relates to the field of building structures, and discloses an assembling construction method for a large steel structure roof, which comprises the following steps of: 1, assembling a secondary truss on the ground; 2, floor trusses are spliced; according to the method, the trusses are reasonably partitioned and spliced by adopting a method of splicing and then lifting the sub-trusses, and jig frame elevation control, linear control and welding deformation control are carried out on the small splicing units, so that high-precision and high-efficiency construction of large steel structure roof splicing is realized; and the connection error of various truss members in the splicing process is further reduced, and the mounting quality and precision of the steel structure roof truss are improved.
本发明涉及建筑结构领域,且公开了一种大型钢结构屋盖的拼装施工方法,该方法包括以下步骤:步骤一:进行次桁架地面拼装;步骤二:进行楼面桁架拼装;本发明通过采用分桁架拼装再提升的方法,对桁架进行合理分区拼装,并对小拼单元进行胎架标高控制、线型控制以及焊接变形控制,进而实现了大型钢结构屋盖拼装的高精度、高效率施工,进一步减小了拼装过程中各类桁架构件的连接误差,提高钢结构屋盖桁架的安装质量与精度。
Assembling construction method for large steel structure roof
一种大型钢结构屋盖的拼装施工方法
HU JIAJIA (author) / WANG LEI (author) / LI SHUANGLAI (author) / XIE QIANG (author) / FU XIANG (author) / CHEN YUCHENG (author) / SHI YU (author) / XIONG GANG (author) / LI XINGRUN (author) / ZHAO DONGHUA (author)
2024-11-15
Patent
Electronic Resource
Chinese
Modularized assembling construction method for large-span multi-curvature deformed steel truss roof
European Patent Office | 2023
|Large-span pipe truss roof truss assembling construction method
European Patent Office | 2021
|Unloading construction method for large steel structure roof
European Patent Office | 2024
|Large-span steel structure roof reverse construction method
European Patent Office | 2023
|Fabricated building steel structure roof and assembling method
European Patent Office | 2021
|