Construction method of stand column type inspection pit
The invention relates to a construction method of a stand column type inspection pit. A reserved column part of a stand column is constructed on a structural foundation; the steel rail is transported to the site, a steel rail temporary support is adopted to temporarily support the steel rail, the steel rail temporary support comprises a stirrup system and a steel rail bracket system, the steel rail bracket system is installed above the stirrup system, the stirrup system is supported on the construction ground, and the steel rail is supported on the steel rail bracket system; the position of the steel rail is adjusted through the steel rail temporary support till the design standard is met; when the steel rail is stably supported by the steel rail temporary support, the prefabricated column part of the stand column is installed below the steel rail, and the prefabricated column and the reserved column are spliced and fixed to form an integral stand column structure; and the steel rails are installed on the prefabricated columns. The method has the advantages that the position precision of the steel rail can be effectively ensured, and then the construction quality of inspection pit construction is improved; rapid construction of the inspection pit stand column is achieved, and the structural performance and installation precision of the stand column can be further guaranteed.
本发明涉及一种立柱式检查坑的施工方法,在结构基础上施作立柱的预留柱部分;运输钢轨至现场,采用钢轨临时支架对钢轨进行临时支撑,钢轨临时支架包括马镫系统和钢轨托架系统,钢轨托架系统安装在马镫系统的上方,马镫系统支撑在施工地面上,钢轨支撑在钢轨托架系统上;通过钢轨临时支架对钢轨的位置进行调整直至满足设计标准;在钢轨通过钢轨临时支架的稳定支撑时,于钢轨的下方安装立柱的预制柱部分,将预制柱与预留柱拼装固定构成整体的立柱结构;将钢轨安装到预制柱上。本发明的优点是:可有效确保钢轨的位置精度,进而提高检查坑施工的施工质量;实现检查坑立柱的快速施工,并且可以进一步保证立柱的结构性能和安装精度。
Construction method of stand column type inspection pit
The invention relates to a construction method of a stand column type inspection pit. A reserved column part of a stand column is constructed on a structural foundation; the steel rail is transported to the site, a steel rail temporary support is adopted to temporarily support the steel rail, the steel rail temporary support comprises a stirrup system and a steel rail bracket system, the steel rail bracket system is installed above the stirrup system, the stirrup system is supported on the construction ground, and the steel rail is supported on the steel rail bracket system; the position of the steel rail is adjusted through the steel rail temporary support till the design standard is met; when the steel rail is stably supported by the steel rail temporary support, the prefabricated column part of the stand column is installed below the steel rail, and the prefabricated column and the reserved column are spliced and fixed to form an integral stand column structure; and the steel rails are installed on the prefabricated columns. The method has the advantages that the position precision of the steel rail can be effectively ensured, and then the construction quality of inspection pit construction is improved; rapid construction of the inspection pit stand column is achieved, and the structural performance and installation precision of the stand column can be further guaranteed.
本发明涉及一种立柱式检查坑的施工方法,在结构基础上施作立柱的预留柱部分;运输钢轨至现场,采用钢轨临时支架对钢轨进行临时支撑,钢轨临时支架包括马镫系统和钢轨托架系统,钢轨托架系统安装在马镫系统的上方,马镫系统支撑在施工地面上,钢轨支撑在钢轨托架系统上;通过钢轨临时支架对钢轨的位置进行调整直至满足设计标准;在钢轨通过钢轨临时支架的稳定支撑时,于钢轨的下方安装立柱的预制柱部分,将预制柱与预留柱拼装固定构成整体的立柱结构;将钢轨安装到预制柱上。本发明的优点是:可有效确保钢轨的位置精度,进而提高检查坑施工的施工质量;实现检查坑立柱的快速施工,并且可以进一步保证立柱的结构性能和安装精度。
Construction method of stand column type inspection pit
一种立柱式检查坑的施工方法
ZHANG ZHENG (author) / DAI CHUNYI (author) / LIU XINGONG (author) / YE SHENGWANG (author) / LI WEI (author) / ZHONG GUODONG (author) / CHEN SHIXIONG (author) / WANG ZEYU (author) / HUA JINGBO (author)
2024-11-15
Patent
Electronic Resource
Chinese
Subway prefabricated stand column type inspection pit structure and construction method
European Patent Office | 2021
|Prefabricated stand column inspection tunnel bed construction method
European Patent Office | 2023
|Column type inspection pit cast-in-place concrete track stand column and construction method
European Patent Office | 2022
|Prefabricated inspection pit stand column and construction method thereof
European Patent Office | 2020
|Construction method of inspection pit steel stand column track supporting system
European Patent Office | 2022
|