Sewage pool reverse hanging membrane covering device and method
The invention relates to the technical field of sewage treatment plant construction, and discloses a sewage pool reverse hanging film covering device and method.The method comprises the steps that 1, steel frame keels are installed; 2, preparation is conducted before film installation; 3, a pressure-bearing rope net is arranged on the lower side of the steel frame keel; 4, the membrane material is hoisted in place; 5, the PVDF membrane material membrane bag is unfolded; 6, a windproof rope net is arranged; 7, temporarily fixing the PVDF membrane material; 8, making a waterproof film; step 9, carrying out a water spraying experiment on the PVDF membrane material; according to the method, when the PVDF membrane material is unfolded and tensioned, the operation convenience of the PVDF membrane material can be guaranteed, the PVDF membrane material can be fixed through the membrane material fixing mechanism, the method has the advantages of being simple in construction process, good in construction safety, good in PVDF membrane material tensioning and fixing effect and the like, and the problems that in the prior art, safety is poor, the construction process is tedious, the construction cost is high, and the like are solved. And meanwhile, the on-site construction cost is high, and the like.
本发明涉及污水处理厂施工技术领域,且公开了一种污水池反吊膜覆盖装置及方法,包括:步骤1:安装钢架龙骨;步骤2:膜安装前准备;步骤3:在钢架龙骨下侧设置承压绳网;步骤4:膜材吊装就位;步骤5:展开PVDF膜材膜包;步骤6:设置防风绳网;步骤7:临时固定PVDF膜材;步骤8:做防水膜;步骤9:对PVDF膜材进行淋水实验;本方法在展开和张拉PVDF膜材时,既可以保证对于PVDF膜材的操作的便捷性,又可以通过膜材固定机构对PVDF膜材进行固定,具有施工过程简单、施工安全性和对PVDF膜材的张拉固定效果好等优点,解决了现有工艺存在的安全性差、施工过程繁琐,不便于快速完成吊膜安装,同时现场施工成本高等问题。
Sewage pool reverse hanging membrane covering device and method
The invention relates to the technical field of sewage treatment plant construction, and discloses a sewage pool reverse hanging film covering device and method.The method comprises the steps that 1, steel frame keels are installed; 2, preparation is conducted before film installation; 3, a pressure-bearing rope net is arranged on the lower side of the steel frame keel; 4, the membrane material is hoisted in place; 5, the PVDF membrane material membrane bag is unfolded; 6, a windproof rope net is arranged; 7, temporarily fixing the PVDF membrane material; 8, making a waterproof film; step 9, carrying out a water spraying experiment on the PVDF membrane material; according to the method, when the PVDF membrane material is unfolded and tensioned, the operation convenience of the PVDF membrane material can be guaranteed, the PVDF membrane material can be fixed through the membrane material fixing mechanism, the method has the advantages of being simple in construction process, good in construction safety, good in PVDF membrane material tensioning and fixing effect and the like, and the problems that in the prior art, safety is poor, the construction process is tedious, the construction cost is high, and the like are solved. And meanwhile, the on-site construction cost is high, and the like.
本发明涉及污水处理厂施工技术领域,且公开了一种污水池反吊膜覆盖装置及方法,包括:步骤1:安装钢架龙骨;步骤2:膜安装前准备;步骤3:在钢架龙骨下侧设置承压绳网;步骤4:膜材吊装就位;步骤5:展开PVDF膜材膜包;步骤6:设置防风绳网;步骤7:临时固定PVDF膜材;步骤8:做防水膜;步骤9:对PVDF膜材进行淋水实验;本方法在展开和张拉PVDF膜材时,既可以保证对于PVDF膜材的操作的便捷性,又可以通过膜材固定机构对PVDF膜材进行固定,具有施工过程简单、施工安全性和对PVDF膜材的张拉固定效果好等优点,解决了现有工艺存在的安全性差、施工过程繁琐,不便于快速完成吊膜安装,同时现场施工成本高等问题。
Sewage pool reverse hanging membrane covering device and method
一种污水池反吊膜覆盖装置及方法
YIN BAOGUO (author) / REN XIANGGUI (author) / BAI YUANYIN (author) / FANG LANG (author) / CUI MINGXING (author)
2024-11-15
Patent
Electronic Resource
Chinese
SEWAGE DISCHARGING SYSTEM OF HANGING TOILET, AND HANGING TOILET
European Patent Office | 2023
|