A platform for research: civil engineering, architecture and urbanism
River channel barrage and construction method thereof
The invention relates to the technical field of water conservancy projects, and discloses a river channel barrage and a construction method thereof.The river channel barrage comprises a dam body assembly, the dam body assembly comprises a plurality of prefabricated dam bodies arranged in the direction perpendicular to the water flow direction of a river channel, and the adjacent prefabricated dam bodies are connected through connecting structures. According to the method, the whole dam body is divided into multiple sections, and then the situation that all the sections of the prefabricated dam body need to be subjected to cast-in-place construction in the construction process of the dam body is avoided through the mode that the prefabricated dam body is prefabricated, machined and produced in advance. And the cast-in-place construction time is saved. And when the concrete prefabricated dam body is prefabricated in a factory, the influence caused by climatic factors of a construction area does not need to be considered, and the problem faced by cast-in-place construction is solved. Therefore, the construction time can be greatly saved and the construction period can be shortened when the river channel barrage is built.
本发明涉及水利工程技术领域,公开了一种河道堰坝及其施工方法,河道堰坝包括:坝体组件,坝体组件包括:沿垂直于河道水流方向设置的多个预制坝体,相邻预制坝体之间通过连接结构连接。本发明将整个坝体分为多段,然后通过提前预制加工生产各段预制坝体的方式,避免了坝体在施工中全部需要现场浇筑施工。节省了现场浇筑施工的时间。而且在工厂预制混凝土预制坝体时也不用考虑施工区域气候因素造成的影响,克服了现场浇筑施工面临的难题。因此修建这种河道堰坝可以大大节省施工时间、缩短施工周期。
River channel barrage and construction method thereof
The invention relates to the technical field of water conservancy projects, and discloses a river channel barrage and a construction method thereof.The river channel barrage comprises a dam body assembly, the dam body assembly comprises a plurality of prefabricated dam bodies arranged in the direction perpendicular to the water flow direction of a river channel, and the adjacent prefabricated dam bodies are connected through connecting structures. According to the method, the whole dam body is divided into multiple sections, and then the situation that all the sections of the prefabricated dam body need to be subjected to cast-in-place construction in the construction process of the dam body is avoided through the mode that the prefabricated dam body is prefabricated, machined and produced in advance. And the cast-in-place construction time is saved. And when the concrete prefabricated dam body is prefabricated in a factory, the influence caused by climatic factors of a construction area does not need to be considered, and the problem faced by cast-in-place construction is solved. Therefore, the construction time can be greatly saved and the construction period can be shortened when the river channel barrage is built.
本发明涉及水利工程技术领域,公开了一种河道堰坝及其施工方法,河道堰坝包括:坝体组件,坝体组件包括:沿垂直于河道水流方向设置的多个预制坝体,相邻预制坝体之间通过连接结构连接。本发明将整个坝体分为多段,然后通过提前预制加工生产各段预制坝体的方式,避免了坝体在施工中全部需要现场浇筑施工。节省了现场浇筑施工的时间。而且在工厂预制混凝土预制坝体时也不用考虑施工区域气候因素造成的影响,克服了现场浇筑施工面临的难题。因此修建这种河道堰坝可以大大节省施工时间、缩短施工周期。
River channel barrage and construction method thereof
一种河道堰坝及其施工方法
LI JINGSONG (author) / CAI LIJING (author)
2024-11-22
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Construction of Temple Barrage on river lot
Engineering Index Backfile | 1952
|British Library Online Contents | 1996
Height-adjustable barrage system suitable for seasonal river channel
European Patent Office | 2023
|Construction of goolwa barrage
Engineering Index Backfile | 1940
|