A platform for research: civil engineering, architecture and urbanism
Excavator pressure feed anti-fracture device for timber pile and pressure feed method thereof
The invention discloses an excavator pressure feeding anti-fracture device for a timber pile and a pressure feeding method of the excavator pressure feeding anti-fracture device. The excavator pressure feeding anti-fracture device comprises a sleeve, a pressure feeding device and a pressure feeding device, wherein the top of the to-be-pressure-fed timber pile is sleeved with the sleeve, and the inner diameter of the sleeve is larger than the diameter of the to-be-pressure-fed timber pile; the connecting piece is used for detachably connecting the sleeve with the timber pile to be pressed and fed; and the roller is used for pressure feeding of the excavator, the roller is located above the timber pile to be subjected to pressure feeding and rotationally connected to the top of the sleeve, and the construction quality is improved by arranging the pressure feeding anti-fracture device for the excavator.
本发明公开了一种用于木桩的挖机压送防断裂装置及其压送方法,所述挖机压送防断裂装置包括:用于套设在待压送木桩的顶部的套筒,所述套筒的内径大于所述待压送木桩的直径;用于将所述套筒与所述待压送木桩可拆卸连接的连接件;供挖机压送的滚筒,所述滚筒位于所述待压送木桩的上方、且转动连接在所述套筒的顶部,通过设置所述挖机压送防断裂装置提高了施工质量。
Excavator pressure feed anti-fracture device for timber pile and pressure feed method thereof
The invention discloses an excavator pressure feeding anti-fracture device for a timber pile and a pressure feeding method of the excavator pressure feeding anti-fracture device. The excavator pressure feeding anti-fracture device comprises a sleeve, a pressure feeding device and a pressure feeding device, wherein the top of the to-be-pressure-fed timber pile is sleeved with the sleeve, and the inner diameter of the sleeve is larger than the diameter of the to-be-pressure-fed timber pile; the connecting piece is used for detachably connecting the sleeve with the timber pile to be pressed and fed; and the roller is used for pressure feeding of the excavator, the roller is located above the timber pile to be subjected to pressure feeding and rotationally connected to the top of the sleeve, and the construction quality is improved by arranging the pressure feeding anti-fracture device for the excavator.
本发明公开了一种用于木桩的挖机压送防断裂装置及其压送方法,所述挖机压送防断裂装置包括:用于套设在待压送木桩的顶部的套筒,所述套筒的内径大于所述待压送木桩的直径;用于将所述套筒与所述待压送木桩可拆卸连接的连接件;供挖机压送的滚筒,所述滚筒位于所述待压送木桩的上方、且转动连接在所述套筒的顶部,通过设置所述挖机压送防断裂装置提高了施工质量。
Excavator pressure feed anti-fracture device for timber pile and pressure feed method thereof
用于木桩的挖机压送防断裂装置及其压送方法
ZHU LEI (author) / CHEN KANG (author) / ZHAO WEI (author) / ZHOU JIAQING (author) / YANG ZHEHAO (author) / ZHOU QIANG (author) / ZHANG ZILIN (author) / FENG CHANGZHENG (author) / XU NAN (author)
2024-11-22
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Breathable controllable feed hopper of static-pressure pipe pile sinking machine machine
European Patent Office | 2015
|