A platform for research: civil engineering, architecture and urbanism
Core filling device for prestressed concrete pipe pile
The invention relates to the technical field of core grouting construction, in particular to a core grouting device for a prestressed concrete pipe pile, and mainly solves the problems of high core grouting difficulty and low core grouting quality of the prestressed concrete pipe pile which is grouted through a tower crane hopper in the prior art. The core filling mechanism comprises a material storage tank, the material storage tank is fixedly connected with the connecting plate, a feeding port is formed in the upper end of the material storage tank, a discharging port is formed in the lower end of the material storage tank, a discharging pipe is arranged at the discharging port, an electric switch valve is arranged on the discharging pipe, a stirring mechanism is arranged in the material storage tank, and the stirring mechanism is connected with the material storage tank. Lifting lugs are arranged on the upper surface of the connecting plate and located on the peripheral side of the material storage tank, a bottom plate is connected to the lower surface of the connecting plate and located on the peripheral side of the material storage tank through electric telescopic rods, universal wheels are arranged on the lower surface of the bottom plate, and a limiting mechanism used for positioning the core filling mechanism is arranged on the bottom plate.
本发明涉及灌芯施工技术领域,尤其涉及一种用于预应力混凝土管桩的灌芯装置,它主要解决了现有技术中通过塔机料斗灌芯预应力混凝土管桩的灌芯难度大、灌芯质量低的问题,包括连接板,所述连接板的中部设有灌芯机构,所述灌芯机构包括储料罐,所述储料罐与连接板固定连接,所述储料罐的上端设有进料口,所述储料罐的下端设有出料口,所述出料口处设有出料管,所述出料管上设有电动开关阀,所述储料罐内设有搅拌机构,所述连接板的上表面且位于储料罐的周侧设有吊耳,所述连接板的下表面且位于储料罐的周侧通过电动伸缩杆连接有底板,所述底板的下表面设有万向轮,所述底板上设有用于灌芯机构定位的限位机构。
Core filling device for prestressed concrete pipe pile
The invention relates to the technical field of core grouting construction, in particular to a core grouting device for a prestressed concrete pipe pile, and mainly solves the problems of high core grouting difficulty and low core grouting quality of the prestressed concrete pipe pile which is grouted through a tower crane hopper in the prior art. The core filling mechanism comprises a material storage tank, the material storage tank is fixedly connected with the connecting plate, a feeding port is formed in the upper end of the material storage tank, a discharging port is formed in the lower end of the material storage tank, a discharging pipe is arranged at the discharging port, an electric switch valve is arranged on the discharging pipe, a stirring mechanism is arranged in the material storage tank, and the stirring mechanism is connected with the material storage tank. Lifting lugs are arranged on the upper surface of the connecting plate and located on the peripheral side of the material storage tank, a bottom plate is connected to the lower surface of the connecting plate and located on the peripheral side of the material storage tank through electric telescopic rods, universal wheels are arranged on the lower surface of the bottom plate, and a limiting mechanism used for positioning the core filling mechanism is arranged on the bottom plate.
本发明涉及灌芯施工技术领域,尤其涉及一种用于预应力混凝土管桩的灌芯装置,它主要解决了现有技术中通过塔机料斗灌芯预应力混凝土管桩的灌芯难度大、灌芯质量低的问题,包括连接板,所述连接板的中部设有灌芯机构,所述灌芯机构包括储料罐,所述储料罐与连接板固定连接,所述储料罐的上端设有进料口,所述储料罐的下端设有出料口,所述出料口处设有出料管,所述出料管上设有电动开关阀,所述储料罐内设有搅拌机构,所述连接板的上表面且位于储料罐的周侧设有吊耳,所述连接板的下表面且位于储料罐的周侧通过电动伸缩杆连接有底板,所述底板的下表面设有万向轮,所述底板上设有用于灌芯机构定位的限位机构。
Core filling device for prestressed concrete pipe pile
一种用于预应力混凝土管桩的灌芯装置
JIANG TIANWEN (author) / LI BINGXUAN (author) / GUO XIAONONG (author) / CHEN SHAOQING (author) / LIN ZONGWEI (author) / ZHENG XIANDA (author) / WANG YONGMING (author) / LIN SHANGQI (author)
2024-11-22
Patent
Electronic Resource
Chinese
European Patent Office | 2023
|