Construction method of herringbone hanging piece suspended ceiling
The invention relates to a construction method of a herringbone hanging piece suspended ceiling, which is characterized in that the whole suspended ceiling is divided into a plurality of construction areas by adopting an area dividing mode, each construction area is assembled on the ground, and then is connected with a suspender of the ceiling in an integral hoisting mode, so that the aloft work is reduced, and the assembly efficiency is improved. According to the construction area, a plurality of secondary keels arranged at intervals are fixedly connected with a plurality of main keels perpendicular to the secondary keels, hanging pieces are installed on each secondary keel in the same direction at intervals, and a hanging piece which is vertically turned is installed in a gap between every two adjacent hanging pieces of the secondary keels through a hanging piece shaped like a Chinese character'ji '. Therefore, the hanging pieces on the whole construction area form a crossed herringbone shape. According to the designed construction method, main construction links can be completed on the ground, the assembly speed can be increased through line production, and the suspended ceiling formed through construction is attractive in appearance.
本发明涉及一种“人”字造型的挂片吊顶施工方法,采用划分片区的方式将整个吊顶划分为多个施工片区,每个施工片区均在地面上完成装配,然后通过整体吊装方式与顶棚的吊杆连接,减少高空作业并提高装配效率。施工片区是将多根间隔排布的次龙骨与多根垂直于次龙骨的主龙骨固定连接,并在每根次龙骨上沿同向间隔安装挂片,在次龙骨的相邻挂片之间的间隙处,利用几字型挂件再安装一个垂直转向后的挂片,使得整个施工片区上的挂片形成交叉的“人”字造型。本发明所设计的施工方法,主要施工环节均可在地面完成,且可以采用流水作业提高装配速度,施工形成的吊顶造型美观。
Construction method of herringbone hanging piece suspended ceiling
The invention relates to a construction method of a herringbone hanging piece suspended ceiling, which is characterized in that the whole suspended ceiling is divided into a plurality of construction areas by adopting an area dividing mode, each construction area is assembled on the ground, and then is connected with a suspender of the ceiling in an integral hoisting mode, so that the aloft work is reduced, and the assembly efficiency is improved. According to the construction area, a plurality of secondary keels arranged at intervals are fixedly connected with a plurality of main keels perpendicular to the secondary keels, hanging pieces are installed on each secondary keel in the same direction at intervals, and a hanging piece which is vertically turned is installed in a gap between every two adjacent hanging pieces of the secondary keels through a hanging piece shaped like a Chinese character'ji '. Therefore, the hanging pieces on the whole construction area form a crossed herringbone shape. According to the designed construction method, main construction links can be completed on the ground, the assembly speed can be increased through line production, and the suspended ceiling formed through construction is attractive in appearance.
本发明涉及一种“人”字造型的挂片吊顶施工方法,采用划分片区的方式将整个吊顶划分为多个施工片区,每个施工片区均在地面上完成装配,然后通过整体吊装方式与顶棚的吊杆连接,减少高空作业并提高装配效率。施工片区是将多根间隔排布的次龙骨与多根垂直于次龙骨的主龙骨固定连接,并在每根次龙骨上沿同向间隔安装挂片,在次龙骨的相邻挂片之间的间隙处,利用几字型挂件再安装一个垂直转向后的挂片,使得整个施工片区上的挂片形成交叉的“人”字造型。本发明所设计的施工方法,主要施工环节均可在地面完成,且可以采用流水作业提高装配速度,施工形成的吊顶造型美观。
Construction method of herringbone hanging piece suspended ceiling
一种“人”字造型的挂片吊顶施工方法
GUAN SHILIN (author) / YE XIANG (author) / GUO WEIGUO (author) / SHEN JIANMING (author) / ZHU XIAOHUA (author) / ZHU LIANG (author) / DAI ZHENGWEI (author) / MENG GUOFU (author) / FENG YINHAI (author) / ZHANG HAORAN (author)
2024-11-22
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Glass fiber sound absorption hanging piece suspended ceiling system
European Patent Office | 2021
|Hanging piece suspended ceiling structure and system and control method
European Patent Office | 2024
|European Patent Office | 2021
|