The invention discloses a road noise reduction construction method, and belongs to the field of road construction. A road noise reduction construction method comprises the following steps that firstly, a noise reduction device is fixed to the outer portion of on-site construction equipment; 2, after the construction stage is completed, mobile dust suppression is conducted on the site; 3, the step 2 is repeated, and meanwhile spraying dust falling operation is conducted on the site. Noise reduction treatment is conducted on construction equipment through the walking rack of the sound insulation plate structure and the overturning cover; the operation stability of on-site construction equipment can be guaranteed, linkage of the noise reduction device is achieved when the on-site construction equipment moves, and meanwhile interference between vibration generated when the on-site construction equipment works and the noise reduction device can be avoided through elastic connection. In addition, by arranging the spraying assembly, the flying dust is settled in time, and meanwhile the flying dust generated in the moving or fixed state of the noise reduction device is further avoided.
本发明公开了一种公路降噪施工方法,属于公路施工领域。一种公路降噪施工方法,包括如下步骤:步骤一:在现场施工设备外部固定降噪装置;步骤二:施工阶段性完成后,对现场进行移动抑尘;步骤三:重复步骤二,同时对现场进行喷淋降尘作业。本发明利用隔音板结构的行走机架和翻转盖对施工设备实现降噪处理;不仅能够保证现场施工设备的操作稳定性,且实现了现场施工设备移动时降噪装置的联动,同时利用弹性连接还能够避免现场施工设备工作时产生的振动和降噪装置产生干涉;另外,通过设置喷淋组件,及时对扬尘进行沉化处理的同时,进一步地避免降噪装置移动或者固定的状态下产生的扬尘。
The invention discloses a road noise reduction construction method, and belongs to the field of road construction. A road noise reduction construction method comprises the following steps that firstly, a noise reduction device is fixed to the outer portion of on-site construction equipment; 2, after the construction stage is completed, mobile dust suppression is conducted on the site; 3, the step 2 is repeated, and meanwhile spraying dust falling operation is conducted on the site. Noise reduction treatment is conducted on construction equipment through the walking rack of the sound insulation plate structure and the overturning cover; the operation stability of on-site construction equipment can be guaranteed, linkage of the noise reduction device is achieved when the on-site construction equipment moves, and meanwhile interference between vibration generated when the on-site construction equipment works and the noise reduction device can be avoided through elastic connection. In addition, by arranging the spraying assembly, the flying dust is settled in time, and meanwhile the flying dust generated in the moving or fixed state of the noise reduction device is further avoided.
本发明公开了一种公路降噪施工方法,属于公路施工领域。一种公路降噪施工方法,包括如下步骤:步骤一:在现场施工设备外部固定降噪装置;步骤二:施工阶段性完成后,对现场进行移动抑尘;步骤三:重复步骤二,同时对现场进行喷淋降尘作业。本发明利用隔音板结构的行走机架和翻转盖对施工设备实现降噪处理;不仅能够保证现场施工设备的操作稳定性,且实现了现场施工设备移动时降噪装置的联动,同时利用弹性连接还能够避免现场施工设备工作时产生的振动和降噪装置产生干涉;另外,通过设置喷淋组件,及时对扬尘进行沉化处理的同时,进一步地避免降噪装置移动或者固定的状态下产生的扬尘。
Road noise reduction construction method
一种公路降噪施工方法
DAI YU (author)
2024-11-29
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
B01D
SEPARATION
,
Trennen
/
B08B
Reinigen allgemein
,
CLEANING IN GENERAL
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Construction device for road noise reduction and construction method thereof
European Patent Office | 2021
|Road noise reduction protection structure and construction method thereof
European Patent Office | 2020
|