Roadbed slope protection concrete rapid pouring device and construction method
The invention belongs to the technical field of building construction, and particularly relates to a roadbed slope protection concrete rapid pouring device and a construction method.The pouring device comprises a material collecting bin, a material conveying guide pipe, a discharging guide pipe, a pouring trolley and a driving system, the material collecting bin is installed at the top of the pouring trolley, and a discharging opening is formed in the position, close to the bottom, of the material collecting bin; an adjusting valve is arranged at the discharging opening, the material conveying guide pipe is connected with the discharging opening, and the discharging guide pipe is connected with the material conveying guide pipe through a flange; the construction method mainly comprises the steps of placing in place, installing the material pipe, pouring and moving; compared with the prior art, the pouring requirement of the small-section component can be met, and meanwhile the safety in the construction process is improved.
本发明属于建筑施工技术领域,具体为一种路基边坡防护混凝土快速浇筑装置及施工方法,浇筑装置包括集料仓、输料导管、卸料导管、浇筑小车和驱动系统,所述集料仓安装在浇筑小车顶部,所述集料仓靠近底部的位置设置有卸料口,卸料口处设置有调节阀,所述输料导管与卸料口连接,所述卸料导管通过法兰与输料导管连接;施工方法主要包括:就位与料管安装、浇筑和移动;相比于现有技术,本发明可以满足小断面构件的浇筑需求,同时提高了施工过程中的安全性。
Roadbed slope protection concrete rapid pouring device and construction method
The invention belongs to the technical field of building construction, and particularly relates to a roadbed slope protection concrete rapid pouring device and a construction method.The pouring device comprises a material collecting bin, a material conveying guide pipe, a discharging guide pipe, a pouring trolley and a driving system, the material collecting bin is installed at the top of the pouring trolley, and a discharging opening is formed in the position, close to the bottom, of the material collecting bin; an adjusting valve is arranged at the discharging opening, the material conveying guide pipe is connected with the discharging opening, and the discharging guide pipe is connected with the material conveying guide pipe through a flange; the construction method mainly comprises the steps of placing in place, installing the material pipe, pouring and moving; compared with the prior art, the pouring requirement of the small-section component can be met, and meanwhile the safety in the construction process is improved.
本发明属于建筑施工技术领域,具体为一种路基边坡防护混凝土快速浇筑装置及施工方法,浇筑装置包括集料仓、输料导管、卸料导管、浇筑小车和驱动系统,所述集料仓安装在浇筑小车顶部,所述集料仓靠近底部的位置设置有卸料口,卸料口处设置有调节阀,所述输料导管与卸料口连接,所述卸料导管通过法兰与输料导管连接;施工方法主要包括:就位与料管安装、浇筑和移动;相比于现有技术,本发明可以满足小断面构件的浇筑需求,同时提高了施工过程中的安全性。
Roadbed slope protection concrete rapid pouring device and construction method
一种路基边坡防护混凝土快速浇筑装置及施工方法
HUANG WANG (author) / XING LINGMIN (author) / DENG GAOQUAN (author) / CHEN ZUWEI (author) / DU HUIXIA (author) / HUANG WEI (author)
2024-11-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Roadbed slope protection device and roadbed slope protection method
European Patent Office | 2021
|Roadbed slope protection method and roadbed slope structure
European Patent Office | 2023
|Roadbed slope protection device for highway construction
European Patent Office | 2024
|