A platform for research: civil engineering, architecture and urbanism
Concrete pool pilaster and post-pouring construction method thereof
The invention discloses a concrete pool pilaster and a post-pouring construction method thereof, and belongs to the technical field of constructional engineering.The pilaster body comprises a first framework and a first pouring body, and the first pouring body is formed in the mode that the first pouring body is poured on the inner side and the outer side of the first framework; the connecting section comprises a second framework and a second pouring body, and the second pouring body is formed in the mode that the second pouring body is poured on the inner side and the outer side of the second framework. The second framework and the second pouring body are embedded in an opening reserved in the pool wall; the first framework and the second framework are connected into a whole, and the first pouring body and the second pouring body are synchronously formed; when the first pouring body and the second pouring body are projected to the pool wall, the projection area of the first pouring body is smaller than that of the second pouring body. According to the invention, asynchronous construction of the pool wall and the pilaster can be realized, and the integrality and the sealing property can meet the use requirements of the concrete pool.
本发明公开了一种混凝土水池壁柱及其后浇筑施工方法,属于建筑工程技术领域,所述壁柱主体包括第一骨架和第一浇注体,所述第一浇注体以浇筑在第一骨架内外侧的方式成型;所述连接段包括第二骨架和第二浇注体,所述第二浇注体以浇筑在所述第二骨架内外侧的方式成型;所述第二骨架和第二浇注体嵌设在池壁预留的开口内;所述第一骨架和所述第二骨架连接为一个整体,所述第一浇注体和所述第二浇注体同步成型;所述第一浇注体和第二浇注体投影至所述池壁时,所述第一浇注体的投影面积小于所述第二浇注体的投影面积。本发明能够实现池壁和壁柱的非同步施工,且整体性和密封性都能够满足混凝土水池的使用要求。
Concrete pool pilaster and post-pouring construction method thereof
The invention discloses a concrete pool pilaster and a post-pouring construction method thereof, and belongs to the technical field of constructional engineering.The pilaster body comprises a first framework and a first pouring body, and the first pouring body is formed in the mode that the first pouring body is poured on the inner side and the outer side of the first framework; the connecting section comprises a second framework and a second pouring body, and the second pouring body is formed in the mode that the second pouring body is poured on the inner side and the outer side of the second framework. The second framework and the second pouring body are embedded in an opening reserved in the pool wall; the first framework and the second framework are connected into a whole, and the first pouring body and the second pouring body are synchronously formed; when the first pouring body and the second pouring body are projected to the pool wall, the projection area of the first pouring body is smaller than that of the second pouring body. According to the invention, asynchronous construction of the pool wall and the pilaster can be realized, and the integrality and the sealing property can meet the use requirements of the concrete pool.
本发明公开了一种混凝土水池壁柱及其后浇筑施工方法,属于建筑工程技术领域,所述壁柱主体包括第一骨架和第一浇注体,所述第一浇注体以浇筑在第一骨架内外侧的方式成型;所述连接段包括第二骨架和第二浇注体,所述第二浇注体以浇筑在所述第二骨架内外侧的方式成型;所述第二骨架和第二浇注体嵌设在池壁预留的开口内;所述第一骨架和所述第二骨架连接为一个整体,所述第一浇注体和所述第二浇注体同步成型;所述第一浇注体和第二浇注体投影至所述池壁时,所述第一浇注体的投影面积小于所述第二浇注体的投影面积。本发明能够实现池壁和壁柱的非同步施工,且整体性和密封性都能够满足混凝土水池的使用要求。
Concrete pool pilaster and post-pouring construction method thereof
一种混凝土水池壁柱及其后浇筑施工方法
MA JINSHAN (author) / PAN LIANG (author) / HU QIONGFEI (author)
2024-11-29
Patent
Electronic Resource
Chinese
Integrated formwork system suitable for pool wall concrete pouring and construction method thereof
European Patent Office | 2020
|