A platform for research: civil engineering, architecture and urbanism
Grouting equipment for cast-in-situ bored pile
The invention relates to grouting equipment for a cast-in-situ bored pile. The grouting equipment comprises a grouting device, the rack comprises a chassis, and the grouting device is assembled at one end of the chassis; the connecting piece is assembled at the other end of the chassis; the L-shaped frame comprises a fixed section and a connecting section which are vertically connected and assembled with each other, one side of the connecting section is connected with the connecting piece through a connecting rod, a clamping rod is assembled on the other side of the connecting section in a sliding mode, and an adjusting piece connected with the clamping rod is further arranged in the connecting section and used for controlling the clamping rod to reciprocate in the length direction of the connecting section. According to the scheme, by means of the clamping rods and the L-shaped frame which can clamp the guide pipes, the device can stably hang the guide pipes of different specifications or move the guide pipes up and down, and the use convenience of the device is improved.
本申请涉及一种钻孔灌注桩的注浆设备,包括:注浆装置;机架,所述机架包括:底盘,所述注浆装置装配于所述底盘一端上;连接件,所述连接件装配于所述底盘的另一端上;L形架,所述L形架包括相互垂直连接装配的固定段和连接段,所述连接段一侧通过连接杆与所述连接件相连,其另一侧滑动装配有夹持杆,所述连接段中还设有与夹持杆连接的调节件,用于控制夹持杆沿连接段的长度方向往复运动。通过采用上述方案,利用能够对导管进行夹持的夹持杆和L形架,使得装置可以对不同规格的导管均能够进行稳定的悬挂或使其上下移动,提高了装置使用时的便捷性。
Grouting equipment for cast-in-situ bored pile
The invention relates to grouting equipment for a cast-in-situ bored pile. The grouting equipment comprises a grouting device, the rack comprises a chassis, and the grouting device is assembled at one end of the chassis; the connecting piece is assembled at the other end of the chassis; the L-shaped frame comprises a fixed section and a connecting section which are vertically connected and assembled with each other, one side of the connecting section is connected with the connecting piece through a connecting rod, a clamping rod is assembled on the other side of the connecting section in a sliding mode, and an adjusting piece connected with the clamping rod is further arranged in the connecting section and used for controlling the clamping rod to reciprocate in the length direction of the connecting section. According to the scheme, by means of the clamping rods and the L-shaped frame which can clamp the guide pipes, the device can stably hang the guide pipes of different specifications or move the guide pipes up and down, and the use convenience of the device is improved.
本申请涉及一种钻孔灌注桩的注浆设备,包括:注浆装置;机架,所述机架包括:底盘,所述注浆装置装配于所述底盘一端上;连接件,所述连接件装配于所述底盘的另一端上;L形架,所述L形架包括相互垂直连接装配的固定段和连接段,所述连接段一侧通过连接杆与所述连接件相连,其另一侧滑动装配有夹持杆,所述连接段中还设有与夹持杆连接的调节件,用于控制夹持杆沿连接段的长度方向往复运动。通过采用上述方案,利用能够对导管进行夹持的夹持杆和L形架,使得装置可以对不同规格的导管均能够进行稳定的悬挂或使其上下移动,提高了装置使用时的便捷性。
Grouting equipment for cast-in-situ bored pile
一种钻孔灌注桩的注浆设备
GAO FENG (author) / ZHU XIAOBING (author) / ZHANG PENG (author) / CHEN JUN (author) / CHEN GUOTAO (author)
2024-12-03
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile-Bottom Grouting Technology for Bored Cast-in-Situ Pile Foundation
British Library Conference Proceedings | 2003
|Post-grouting construction process for cast-in-situ bored pile
European Patent Office | 2024
|