A platform for research: civil engineering, architecture and urbanism
Green building grating suspended ceiling
The invention relates to the technical field of suspended ceilings, in particular to a green building grating suspended ceiling which comprises a main keel, a hanging rod and a grating and further comprises a mounting assembly. The mounting assembly comprises a spring, a connecting seat, a connecting rod, supporting blocks, a locking block and a rotating component, during mounting, the main keel is mounted on a ceiling through the hanging rod firstly, then the supporting blocks are aligned with clamping grooves in the middle of the main keel, the supporting blocks are inserted into the clamping grooves, and at the moment, the two supporting blocks get close to each other and then are contained in the inner sides of the clamping grooves; after the supporting block moves upwards out of the clamping groove, the supporting block loses limitation, at the moment, the connecting base and the supporting block reset under the action of the spring, then the lower end face of the supporting block abuts against the upper end face of the main keel, at the moment, installation of the grating is completed, and at the moment, the connecting base can transversely move in the clamping groove to drive the grating to transversely move; and finally, the locking blocks extend into the locking grooves, so that the connecting seats are transversely fixed.
本发明涉及吊顶技术领域,具体涉及一种绿色建筑格栅吊顶,包括主龙骨、吊杆和格栅,还包括安装组件;安装组件包括弹簧、连接座、连接杆、支撑块、锁紧块和旋转构件,安装时,首先通过吊杆将主龙骨安装在天花板上,然后将支撑块与主龙骨中部的卡槽对齐,并将支撑块插入卡槽,此时两个支撑块互相靠近,进而收入卡槽内侧,当支撑块向上移出卡槽后,支撑块失去限位,此时连接座和支撑块在弹簧的作用下复位,进而使支撑块的下端面抵接在主龙骨的上端面,此时便完成对格栅的安装,这时连接座能够在卡槽内横向移动,进而带动格栅横向移动,方便对格栅的位置进行调节,最后使锁紧块伸入锁紧槽内部,从而对连接座的横向固定。
Green building grating suspended ceiling
The invention relates to the technical field of suspended ceilings, in particular to a green building grating suspended ceiling which comprises a main keel, a hanging rod and a grating and further comprises a mounting assembly. The mounting assembly comprises a spring, a connecting seat, a connecting rod, supporting blocks, a locking block and a rotating component, during mounting, the main keel is mounted on a ceiling through the hanging rod firstly, then the supporting blocks are aligned with clamping grooves in the middle of the main keel, the supporting blocks are inserted into the clamping grooves, and at the moment, the two supporting blocks get close to each other and then are contained in the inner sides of the clamping grooves; after the supporting block moves upwards out of the clamping groove, the supporting block loses limitation, at the moment, the connecting base and the supporting block reset under the action of the spring, then the lower end face of the supporting block abuts against the upper end face of the main keel, at the moment, installation of the grating is completed, and at the moment, the connecting base can transversely move in the clamping groove to drive the grating to transversely move; and finally, the locking blocks extend into the locking grooves, so that the connecting seats are transversely fixed.
本发明涉及吊顶技术领域,具体涉及一种绿色建筑格栅吊顶,包括主龙骨、吊杆和格栅,还包括安装组件;安装组件包括弹簧、连接座、连接杆、支撑块、锁紧块和旋转构件,安装时,首先通过吊杆将主龙骨安装在天花板上,然后将支撑块与主龙骨中部的卡槽对齐,并将支撑块插入卡槽,此时两个支撑块互相靠近,进而收入卡槽内侧,当支撑块向上移出卡槽后,支撑块失去限位,此时连接座和支撑块在弹簧的作用下复位,进而使支撑块的下端面抵接在主龙骨的上端面,此时便完成对格栅的安装,这时连接座能够在卡槽内横向移动,进而带动格栅横向移动,方便对格栅的位置进行调节,最后使锁紧块伸入锁紧槽内部,从而对连接座的横向固定。
Green building grating suspended ceiling
一种绿色建筑格栅吊顶
YU CHAOHUI (author) / DING KAIYUE (author) / RONG LI (author)
2024-12-03
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Fabricated suspended ceiling structure of green building
European Patent Office | 2022
|Fabricated suspended ceiling structure of green building
European Patent Office | 2024
|Fabricated suspended ceiling structure of green building
European Patent Office | 2021
|