A platform for research: civil engineering, architecture and urbanism
Construction device and construction method for improving flatness of waffle plate
The invention discloses a construction device and a construction method for improving the flatness of a waffle plate, and relates to the technical field of waffle plate construction.The construction device comprises a base plate, a top plate, a barrel-shaped structure and a plate-shaped structure, clamping assemblies are symmetrically arranged at the bottom of the top plate, a hoisting assembly is arranged at the top of the top plate, and the construction device further comprises side plates symmetrically arranged at the bottom of the top plate, one side of the bottom end of the side plate is fixedly connected with a balance weight plate, and base holes are evenly formed in the top of the base plate. The clamping assembly comprises motors which are symmetrically and fixedly installed, and the output ends of the motors are fixedly connected with lead screws. The hoisting assembly comprises fixing rods and steel ropes which are symmetrically arranged, the top ends of the fixing rods are fixedly connected with top blocks, and the problems that when a crane is adopted for hoisting a barrel plate structure, the barrel plate structure is inconvenient to correspond to a datum line, and a waffle plate is prone to being installed unevenly are solved; and the positioning accuracy and the subsequent mounting efficiency of the waffle plate are reduced.
本发明公开了一种用于提升华夫板平整度的施工装置及施工方法,涉及华夫板施工技术领域,包括基板、顶板、桶形结构和板形结构,所述顶板的底部对称设置有夹紧组件,所述顶板的顶部设置有吊装组件,还包括:侧板,对称设置在顶板的底部,所述侧板的底端一侧固定连接有配重板,所述基板的顶部均匀开设有基孔;所述夹紧组件包括对称固定安装的电机,所述电机的输出端固定连接有丝杆;所述吊装组件包括对称设置的固定杆和钢绳,所述固定杆的顶端固定连接有顶块,解决了采用吊机对桶板结构进行吊装时,不便于使得桶板结构与基准线对应,也容易造成华夫板安装不平整的情况,降低了华夫板的定位精准度和后续的安装效率的问题。
Construction device and construction method for improving flatness of waffle plate
The invention discloses a construction device and a construction method for improving the flatness of a waffle plate, and relates to the technical field of waffle plate construction.The construction device comprises a base plate, a top plate, a barrel-shaped structure and a plate-shaped structure, clamping assemblies are symmetrically arranged at the bottom of the top plate, a hoisting assembly is arranged at the top of the top plate, and the construction device further comprises side plates symmetrically arranged at the bottom of the top plate, one side of the bottom end of the side plate is fixedly connected with a balance weight plate, and base holes are evenly formed in the top of the base plate. The clamping assembly comprises motors which are symmetrically and fixedly installed, and the output ends of the motors are fixedly connected with lead screws. The hoisting assembly comprises fixing rods and steel ropes which are symmetrically arranged, the top ends of the fixing rods are fixedly connected with top blocks, and the problems that when a crane is adopted for hoisting a barrel plate structure, the barrel plate structure is inconvenient to correspond to a datum line, and a waffle plate is prone to being installed unevenly are solved; and the positioning accuracy and the subsequent mounting efficiency of the waffle plate are reduced.
本发明公开了一种用于提升华夫板平整度的施工装置及施工方法,涉及华夫板施工技术领域,包括基板、顶板、桶形结构和板形结构,所述顶板的底部对称设置有夹紧组件,所述顶板的顶部设置有吊装组件,还包括:侧板,对称设置在顶板的底部,所述侧板的底端一侧固定连接有配重板,所述基板的顶部均匀开设有基孔;所述夹紧组件包括对称固定安装的电机,所述电机的输出端固定连接有丝杆;所述吊装组件包括对称设置的固定杆和钢绳,所述固定杆的顶端固定连接有顶块,解决了采用吊机对桶板结构进行吊装时,不便于使得桶板结构与基准线对应,也容易造成华夫板安装不平整的情况,降低了华夫板的定位精准度和后续的安装效率的问题。
Construction device and construction method for improving flatness of waffle plate
一种用于提升华夫板平整度的施工装置及施工方法
ZHU CHENGSEN (author) / CHANG GUANGLE (author) / ZHU DAZHI (author) / WANG ZHIBIN (author) / WANG ZHENGRONG (author) / WANG ZHIHUI (author) / LI LEI (author) / SU YUNHONG (author) / SUN ZHIYUAN (author) / LI WANSHENG (author)
2024-12-03
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Waffle plate construction method using odd cylinder as hole reserving mold
European Patent Office | 2023
|Curved structures in waffle slab construction
Online Contents | 1994
|Curved structures in waffle slab construction
Elsevier | 1994
|