A platform for research: civil engineering, architecture and urbanism
Structure repairing and reinforcing equipment for concrete chimney and cooling tower
The invention relates to the technical field of structure repairing and reinforcing, and discloses concrete chimney and cooling tower structure repairing and reinforcing equipment which comprises a back plate, a lock catch is fixedly mounted at the top of the back plate, a repairing cylinder is fixedly mounted on the outer side of the back plate, and a pump body is fixedly mounted on the lower portion of the outer side of the repairing cylinder. The discharging end of the pump body is connected with a spray gun through a pipeline, the first pull rope and the second pull rope are mutually closed and bound to the outer wall of the chimney or the cooling tower through mutual splicing of the male head and the female base, so that the back plate is fixed to a certain degree, and swing of the back plate is relieved; at the moment, two universal wheels on a side wheel frame at the end of a side rod and a universal wheel at the end of a middle rod are matched to roll on the outer wall face of the chimney or the cooling tower in an attached mode so as to reduce friction resistance, and after operation in the step is finished, a suspended maintenance person can hold the spray gun to move to the defect and damage position; and the pump body is started to spray out the repairing cement in the repairing cylinder through the spray gun, and finally, the maintenance personnel performs trowelling and finishing to finish the maintenance operation.
本发明涉及结构修复加固技术领域,公开了一种混凝土烟囱和冷却塔的结构修复加固设备,包括背板,所述背板的顶部固定安装有锁扣,所述背板的外侧固定安装有修复筒,所述修复筒的外侧下方固定安装有泵体,所述泵体的排出端通过管道连接有喷枪,利用公头和母座相互拼接使得拉绳一和拉绳二相互闭合捆绑在烟囱或冷却塔外壁上,以对背板进行一定的固定,减轻其摆动,此时配合侧杆端部侧轮架上的两个万向轮以及中杆端部上的万向轮贴合滚动在烟囱或冷却塔的外壁面上来较少摩擦阻力,此步骤操作结束,悬吊的维修人员便可以手持喷枪移动到缺陷破损处,并启动泵体将修复筒内的修复水泥通过喷枪喷出,最后维修人员进行抹平,休整即可完成维修作业。
Structure repairing and reinforcing equipment for concrete chimney and cooling tower
The invention relates to the technical field of structure repairing and reinforcing, and discloses concrete chimney and cooling tower structure repairing and reinforcing equipment which comprises a back plate, a lock catch is fixedly mounted at the top of the back plate, a repairing cylinder is fixedly mounted on the outer side of the back plate, and a pump body is fixedly mounted on the lower portion of the outer side of the repairing cylinder. The discharging end of the pump body is connected with a spray gun through a pipeline, the first pull rope and the second pull rope are mutually closed and bound to the outer wall of the chimney or the cooling tower through mutual splicing of the male head and the female base, so that the back plate is fixed to a certain degree, and swing of the back plate is relieved; at the moment, two universal wheels on a side wheel frame at the end of a side rod and a universal wheel at the end of a middle rod are matched to roll on the outer wall face of the chimney or the cooling tower in an attached mode so as to reduce friction resistance, and after operation in the step is finished, a suspended maintenance person can hold the spray gun to move to the defect and damage position; and the pump body is started to spray out the repairing cement in the repairing cylinder through the spray gun, and finally, the maintenance personnel performs trowelling and finishing to finish the maintenance operation.
本发明涉及结构修复加固技术领域,公开了一种混凝土烟囱和冷却塔的结构修复加固设备,包括背板,所述背板的顶部固定安装有锁扣,所述背板的外侧固定安装有修复筒,所述修复筒的外侧下方固定安装有泵体,所述泵体的排出端通过管道连接有喷枪,利用公头和母座相互拼接使得拉绳一和拉绳二相互闭合捆绑在烟囱或冷却塔外壁上,以对背板进行一定的固定,减轻其摆动,此时配合侧杆端部侧轮架上的两个万向轮以及中杆端部上的万向轮贴合滚动在烟囱或冷却塔的外壁面上来较少摩擦阻力,此步骤操作结束,悬吊的维修人员便可以手持喷枪移动到缺陷破损处,并启动泵体将修复筒内的修复水泥通过喷枪喷出,最后维修人员进行抹平,休整即可完成维修作业。
Structure repairing and reinforcing equipment for concrete chimney and cooling tower
一种混凝土烟囱和冷却塔的结构修复加固设备
FU JIANJUN (author) / XU XIANGMING (author) / WEI CHUNHU (author) / LI TIANQI (author) / ZHAN YANGDONG (author) / MA YUGE (author) / LI YANBO (author)
2024-12-03
Patent
Electronic Resource
Chinese
Cooling tower reinforcing and repairing method and system
European Patent Office | 2024
|European Patent Office | 2017
|European Patent Office | 2019
|Reinforced concrete cooling tower ventilator reinforcing structure and method
European Patent Office | 2023
|